SANTA LARA VALLEY WATER Boardroom Audiovisual Modernization Project Engineer’s Report.

                                          SCVWD LIES ABOUT BOARDROOM

Boardroom Audio Visual Modernization Project Engineer’s Report.

Dear SCVWD  honorable board chair, members and staff.Boardroom Audio Visual Modernization Project Engineer’s Report.
This is your old av Sr tech, if you have ever been hooded winked it’s now, why do you think ray and i have been submitting papers on what kamenjati/fung/ravi.and ashu have done( stopped maintenance so the room will fail, paid contracts that have not been done just like rmc.) has anyone from it staff told you about speaking into a microphone ( have they let me explain it or ray, have you seen members of Congress speak on c span? they speak directly into the mic, if others are not speaking directly into the mic, that also means YOU will not be able to hear them)   not saying your wrong but staff has not instructed you on use, nor have they let ray fix problems.  I was told when i was there not to talk to you about equipment.
The Stakeholders Matrix that is submitted for Item 8.1 for Board Meeting 3-8-2016 is from 12-6-2013. Where is the Stakeholders matrix mentioned in the Handout from the IT Ad Hoc Committee meeting June 22, 2015 item 5.2 (page 79) which is dated 4-1-15? Why is the updated version not submitted presently for the agenda item for the Board Members and Publics information?
I WILL COME TO ANY MEETING AND SHOW YOU THE EQUIPMENT, THE PURCHASE PAPERS, AND SUPPLY  CONTRACTORS THAT WILL TELL YOU WE CAN SUPPORT THIS SYSTEM, OR WE INSTALLED THAT EQUIPMENT. 1. Has staff explained that the amx system can do voting, and request to speak as it does now. and that there is an open po with the programmer to have joystick control of ea camera,(( but not done as GK stopped work/SEE EMAIL)  Ask about the 10k of amx processing equipment gk had me buy before i retired/was forced out, but never installed) 2.  HD is not the answer as most people do not have fast internet connections and its bells  and whistles,  flat panels, you have flat panels. 3.  Has staff explained if you want to Skype you can do it now as the room is full of computers hooked to the system.  all you need is a staff person to handle it, that’s free, just download app, but you don’t need Skype, you have a video conferencing system(tandberg now Cisco)( can handle ip, isdn and phone calls  COST 77k$ per Larry wilson). 4.  Has staff told you that people can already call in as we installed a state of the art digital video conferencing system,  this equipment is still up to date. 5.  Has staff been truthful in say the system is 100 % analog no i replaced 75% of the audio and video processing so it is digital, as is the recording of the meetings  both video and audio.  This system can also record committee meetings, just turn cameras, and start recording. this is also digital video record, and audio is also captured on sd cards.  Also digital. 6.  HAS staff explained to you that we can do split screens, we can enlarge images, we can send, hook up and piece of equipment that comes into that board room, from digital to analog. 7. Has staff explained what the district cost will be, you cannot get that room to be rebuilt on 700k plus add the engineer’s cost, staff time already, and by the time the punch list is worked out it will be like the first board room where you sit costing over 2 million, you will want your own person running it not some temp/CONTRACTOR as is going to happen, but the sad thing is, yes its a nice room, but its not a room made for those types of meetings. 8.  This is my tax money just as much as yours, as Gary told ngoc why has nobody been fired, well why did George stop work in the board room, and not get fired? see the email in attachments. why was George allowed to discuss with ray my marriage and medical problems, why  is George allowed to take av techs around the lake to tell them how things will be? why has George been allowed to manipulate the techs, contractors and his staff, they are afraid of him. 9.  Has any of the staff told you that of 2 years ago the wireless microphone (frequencies) were sold by the FCC, which means that you could be fined, i told George of this before i left, as they did it with the original frequencies, so cell phones can have more bandwidth. 10.  I enjoyed working here but when the av MANAGEMENT cannot do there job, this is what happens. 11.  WHO IS PAYING FOR ELECTRICAL, WOODWORK, DRYWALL, PAINTING, BE SURE TO ADD THAT COST. 12.  IF PHIL IS A CTS WHY DID HE NOT SEE THE WIRELESS MICS WERE NOT SOLD OFF 2 YRS AGO MY THE FCC, ADD ANOTHER 20K, FOR  JUST 4 WIRELESS HANDHELDS AND LAVS?   13.  Staff Training: Clear Presentations & Mic Technique x OK Training/procedural Issue, MAYBE STAFF TRAINING AND A COUPLE OF UPGRADES IS ALL YOU NEED. Also what wrong with the beyer goosenecks, its what the board wanted, and if told how to use them they work fine. 14.  Simplify Rear Round Table  MOUNT CEILING THIS EQUIPMENT WAS BOUGHT IN 2011. 15..Provide Better Lighting From Front, Side and Back of Subjects x OK New cameras will operate better in low light conditions,  THE CAMERAS ARE FINE IS THE LIGHTING AS WAS TOLD TO TOM SPADA WHEN I WAS THERE. 16.  I WILL NOT EVEN BOTHER GOING OVER THE MATRIX AS MOST IF NOT ALL OF THAT CAN HAPPEN NOW.   IF YOU WOULD HAVE LISTEN TO THE AV TECH INPUTS (SEE HANDOUT), THEN MAYBE YOU MIGHT BE CLOSE.   I WISH YOU LUCK.   MOST IF NOT ALL OF THIS CAN HAPPEN NOW,  HOWEVER YOU HAVE NOT GOT THE RIGHT COSTS, NOR THE RIGHT ENGINEERS, NOR HAVE YOU THOUGHT OF THE USER’s, WHO STILL DON’T USE THE EQUIPMENT RIGHT. NOR HAVE YOU ASKED STAFF WHAT CAN THIS EQUIPMENT DO? HURRY YOU STILL HAVE TIME TO ADD TO THE COST, FIGURE THE ACOUSTICS OUT, AND ASK HOW DID WE GET ENGINEERS WITH NO BOARDROOM EXPERIENCE.  Remember if you cannot grasp simple equipment, how will you manage higher tech? Does staff and board  read employee reports, or any of the tapes, PR’s, expense reports etc.  we have provided links rebuttals but the board, managers just disregard the info, and keep wasting tax money. AS DUG MUIRHEAD SAID YES I SAW THE SYSTEM break, SO IT SHOULD BE REPLACED, WELL WHAT WAS THE CAUSE OF THAT, GEORGE KAMENJATI STOPPED ALL WORK IN THE ROOM SO THINGS WILL FAIL, HE WOULD NOT EVEN LET RAY GO PICK UP THE TECH DRAWINGS FROM ME AT HOME, NOR GET ALL THE KEYS.
HAVE YOU LOOKED AT RGD NOT ONE BOARD ROOM
THIS ROOM IS UNIQUE, ANYONE CAN BUILD A ROOM BUT THEY HAVE NOT ONE BOARDROOM UNDER THERE BELT. http://rgdacoustics.com/index.php/projects/commercial/ THEY MIGHT BE ACOUSTICAL ENGINEERS, BUT SO WAS  MUZAK  AND SLATER AND ASSOCIATES, AND LOOK WHAT YOU GOT IN 1999.  THEY THEN SUB IT OUT TO A ONE MAN FIRM, THEN YOU HIRED GOELTZ TO FIX AND REPLACE MOST IF NOT ALL OF THE AUDIO AND VIDEO GEAR. AS TO THE ENGINEER SAYING YOU WILL NEED 37 CONVERTERS IS JUST NOT TRUE, A TOP OF THE LINE CONVERTER CAN BE PLACED WITH THE TECH WHO WOULD HANDLE INPUTS OF VARIOUS DEVICES. AND A GOOD UNIT IN THE RACK TO HANDLE OTHER INPUTS IS ALL THAT IS REQUIRED. THIS FIRM HAS BEEN PAID LIKE THE FIRST FIRM TO TELL THE IT DEPT AND YOU WANT YOU WANT, WHEN THIS IS INSTALLED IT WILL BE 5-10 YEARS OLD.  and there is no guarantee that hdmi,sd or whatever will be in favor.  Worry about the draught, add a couple of pieces and find out who stopped adding pieces so you can do a few of the things it cannot. AND HAS THE ENGINEERS TOLD YOU HOW THEY PLAN TO USE THERE ACOUSTICAL EXPERIENCE, AND HOW THEY PLAN TO TRAIN THE END USER TO TALK INTO THE MICROPHONE, HAVE THEY ACCOUNTED FOR IMPROPER USE AND A BAD ROOM DESIGN?   And them pushing you on this hdmi/sunshine act, is 100% wrong, you still have very old legacy computer systems, that are contracted out.  Again ask any local av company if this cannot be maintained and or repaired, it can, you do not need this level of upgrades, nor is 4k required, for the 100 people that watch. AGAIN THIS COMPANY HAS BEEN PAID TO TELL YOU THIS BY NON OTHER THAN THE MANIPULATOR IN THE IT DEPT, AND UPPER STAFF.
again thank you
paul goeltz
If if you do upgrade, just as before there will be 20 different formats coming in from the public, staff and older equipment, all will require adapters just as an super multi function hdmi scaler/converter can be added now, you will never stop the cassette, vga laptop, and different formats, i guess you will just tell the public sorry go home, fire the manager who stopped work, fix what needs to be fixed, lets not waste another 3 MILLION.
attachments Attachment 2 Stakeholder Matrix  MOST IF NOT ALL CAN HAPPEN NOW. and not the current one.
https://vimeo.com/155258547 SCVWD MEETING NOTES MP3 06-22-15 IT Ad Hoc
Handouts-Agenda Item 5.2 READ WERE THE AV TECH WAS INVOLVED, BUT DISMISSED
https://pgoeltz.wordpress.com/wp-content/uploads/2015/07/handouts-agenda-item-5-2.pdf scvwd ray 10 28 2014 EMAILS 062215 IT Ad Hoc Comm Mins  THE ONLY MEETING HELD and the asked for a 2nd meeting?? with rays input
scvwd ray RAYS REBUTTAL 10 28 14
SCVWD PGOELTZ 10 28 2014  SR AV TECH 10 28 14
 paul addressing the board 12 2012 ABOVE,​ and hand out below title joe handout 
DiversityAudit2012  GOOD READING EXPLAINS WHY SCVWD IS LIKE IT IS.
 
THIS IS THE AUDIO NOTES OF LAST it AD HOC MEETING THEY WERE TO HAVE MANY
TO DECIDE THE LIES THIS  AUDIO TRANSCRIPT IS FULL OF SCVWD TELLING LIES, JUST LIKE BEAU WHO GOT FIRED FOR LYING SAD THING IS THIS GROUP IS ALL ELECTED BOARD MEMBERS, WE HAVE PROVEN THE IT DEPT LET THE ROOM FAIL SO THEY CAN SPEND ANOTHER 3 MILLION DURING DROUGHT, SOCIAL MEDIA FRIENDLY, LIKE THE BOARD IS GOING TO STOP IN THE MIDDLE OF MEETING TO TAKE A TWITTER QUESTION, PUBLIC COMMENT IS AT THE START, IF YOU CANNOT MAKE IT SEND EMAIL.
OR THAT ONLY 60K HAS BEEN SPENT WHEN THE ROOM COST OVER 3 MILLION AND I DID OVER 250K OF UPGRADES, GEORGE K TOOK THE TANDBERG vc SYSTEM OUT AND NEVER TOLD THE BOARD IT WAS PUT IN PER REQUEST FROM LARRY WILSON 70K.  SO SEE THE LIES DON’T STOP, FUNG, RAVI, JESASS(CAO) ASHU, GK THEY TELL THE CONTRACTOR WHAT TO SAY AND HOW TO LIE, WANT TO KNOW WHY ONLY ONE CONTRACTOR SHOWED UP FOR THE AV BID, THEY DON’T WANT TO DEAL WITH PSYCHOPATHS .  I CAN GO ON AND ON  I MADE THE ROOM DIGITAL, PUT ASSISTED LISTENING, AMX CAN HANDLE VOTING AS GK SAW THE DEMO, AND IF THEY LET THE TECHS DO THE AV NOT THE STAFF AND START MAITANCE, THINGS WOULD WORK, THERE IS OPEN PO’S FOR ANDERSON ENGINEERING FOR AMX WORK, GK BOUGHT OVER 50K OF GEAR FOR MODERNIZATION AND IT SITS.  IF YOU LOOK AT THE PDF OF REQUEST FOR MIC TRAINING NO ONE PERSON ASKED FOR IT WHICH IS THE CAUSE OF MOST PROBLEMS AUDIO WISE, YOU DONT SPEAK SIDEWAYS INTO MIC.
BACKGROUND: The Boardroom’s audiovisual system was designed in 1997 and built in 2000. (UPGRADED UP TILL 2012 UNTIL GK STOPPED WORK ASK THE AV TECH, OVER 250K SPENT) In addition to the board’s own public meetings, the existing system is used for the District’s many internal divisional, unit, and group meetings, and frequently for other general district and community events of a business, educational, outreach, or celebratory nature. The existing legacy analog-based audiovisual system, uses technology designed over 17 years ago and does not provide for enhanced features of an e-voting ( AMX WILL HANDLE E VOTING AS EA MEMBER ALREADY HAS A AMX SCREEN FOR VOTING)and high resolution multi-screen (ALREADY HAVE MULTI SCREEN AND HD IS A WASTE WHEN 1024X 768 IS BEST) viewing, archiving, editing, casting and streaming of digital audio and video signals. ( SYSTEM IS ALREADY DIGITAL AND DIGITALLY RECORDED BOTH AUDIO AND VIDEO IN 2 DIGITAL FORMATS,)This system is not capable of integrating a sophisticated digital e-voting system and related (ALL LIES ITS ALL SET UP AND JUST NEEDS PROGRAMMING AS ANY NEW SYSTEM WOULD)features, nor does it have enough capacity or compatibility to provide for additional multi-signal switching of wired and wireless digital devices that can accommodate multi-scenario featured meetings. The existing system requires dedicated staff resources to insure basic operation during board meetings. ( ANY AV SYSTEM IS JUST LIKE A CONCERT A CREW IS REQUIRED WHO IS GOING TO WORK THE TWITTER FEED?)The reliability of this aged system is unpredictable and on many occasions has experienced audiovisual devices and power-related deficiencies and failures. Because of the new features requirements, technology limitations and exiting issues, the Project scope will completely overhaul the AV system and provide for a modern electronic voting system. THE SYSTEM WOULD WORK FINE WITH TRAINING AND ASK THE TECH TO TELL YOU WHAT THE SYSTEM CAN DO, GK STOPPED WORK SO THEY CAN REBUILD THEY SAY 900K ITS MORE LIKE ANOTHER 3 MILLION, AS THEY ARE NOT INCLUDING SCVWD STAFF TIME
http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2014_Published_Meetings/MG55522/AS55533/AI55560/DO55650/DO_55650.pdf     this report is all based on lies and untruths dont believe the sr tech ask fired temps or the av tech.

AS DUG MUIRHEAD SAID YES I SAW THE SYSTEM FAIL, SO IT SHOULD BE REPLACED, WELL WHAT WAS THE CAUSE OF THAT, GEORGE KAMENJATI STOPPED ALL WORK IN THE ROOM SO THINGS WILL FAIL, HE WOULD NOT EVEN LET RAY GO PICK UP THE TECH DRAWINGS FROM ME AT HOME, NOR GET ALL THE KEYS.

Attachment 1 Engineer’s Letter  NEW REPORT 2 2016

Attachment 2 Stakeholder Matrix  MOST IF NOT ALL CAN HAPPEN NOW.

BTW WHAT HAPPENED TO THE MATRIX WORKED ON BY THE AV TECH?

Handouts-Agenda Item 5.2 READ WERE THE AV TECH WAS INVOLVED, BUT DISMISSED

SO STAFF CAN HAVE THERE WAY.

HAVE YOU LOOKED AT RGD NOT ONE BOARD ROOM

THIS ROOM IS UNIQUE, ANYONE CAN BUILD A ROOM
BUT THEY HAVE NONE UNDER THERE BELT. 
 
 
THEY MIGHT BE ACOUSTICAL ENGINEERS, BUT SO WAS  MUZAK  AND SLATER AND ASSOCIATES, AND LOOK WHAT YOU GOT IN 1999.  THEY THEN SUB IT OUT TO A ONE MAN FIRM, THEN YOU HIRED GOELTZ TO FIX AND REPLACE MOST IF NOT ALL OF THE AUDIO AND VIDEO GEAR.
AS TO THE ENGINEER SAYING YOU WILL NEED 37 CONVERTERS IS JUST NOT TRUE, A TOP OF THE LINE CONVERTER CAN BE PLACED WITH THE TECH WHO WOULD HANDLE INPUTS OF VARIOUS DEVICES. AND A GOOD UNIT IN THE RACK TO HANDLE OTHER INPUTS IS ALL THAT IS REQUIRED.
THIS FIRM HAS BEEN PAID LIKE THE FIRST FIRM TO TELL THE IT DEPT AND YOU WANT YOU WANT, WHEN THIS IS INSTALLED IT WILL BE 5-10 YEARS OLD.
AND HAS THE ENGINEERS TOLD YOU HOW THEY PLAN TO USE THERE ACOUSTICAL EXPERIENCE, AND HOW THEY PLAN TO TRAIN THE END USER TO TALK INTO THE MICROPHONE, HAVE THEY ACCOUNTED FOR IMPROPER USE AND A BAD ROOM DESIGN?
AGAIN THIS COMPANY HAS BEEN PAID TO TELL YOU THIS BY NON OTHER THAN THE MANIPULATOR IN THE IT DEPT, AND UPPER STAFF.
 this is your old av Sr tech, if you have ever been hooded winked its now, why do you think ray and i have been submitting papers on what kamenjati/fung/ravi. ashu have done( stopped maintenance so the room will fail, paid contracts that have not been done just like rmc.)
has anyone from it staff told you about speaking into a microphone ( have they let me explain it or ray, have you seen members of Congress speak on cspan? they speak directly into the mic, if others are not speaking directly into the mic, that also means YOU will not be able to hear them)   not saying your wrong but staff has not instructed you on use, nor have they let ray fix problems.  I was told when i was there not to talk to you about equipment.
 
I WILL COME TO ANY MEETING AND SHOW YOU THE EQUIPMENT, THE PURCHASE PAPERS, AND SUPPLY  CONTRACTORS THAT WILL TELL YOU WE CAN SUPPORT THIS SYSTEM, OR WE INSTALLED THAT EQUIPMENT.
1. has staff explained that the amx system can do voting, and request to speak as it does now. and that there is an open po with the programmer to have joystick control of ea camera,(( but not done as GK stopped work/SEE EMAIL)  Ask about the 10k of amx processing equipment gk had me buy before i retired/was forced out, but never installed)
2. that hd is not the answer as most people do not have fast internet connections and its bells  and whistles,
3.  Has staff explained if you want to Skype you can do it now as the room is full of computers hooked to the system.  all you need is a staff person to handle it, thats free, just download app, but you don’t need Skype, you have a video conferencing system(tandberg now Cisco)( can handle ip, isdn and phone calls  COST 77k$ per Larry wilson , george kamenjati pulled it out for personnel use)
4.  has staff told you that people can already call in as we installed a state of the art digital video conferencing system,  this equipment is still up to date. ( can handle ip, isdn and phone calls  COST 77k$ per Larry Wilson , george kamenjati pulled it out for personnel use)
5.  has staff been truthful in say the system is 100 % analog no i replaced 75% of the audio and video processing so it is digital, as is the recording of the meetings  both video and audio.  This system can also record committee meetings, just turn cameras, and start recording.
6.  HAS staff explained to you that we can do split screens, we can enlarge images, we can send, hook up and piece of equipment that comes into that board room, from digital to analog.
7. has staff explained what the district cost will be, you cannot get that room to be rebuilt on 700k plus add the engineer’s cost, staff time already, and by the time the punch list is worked out it will be like the first board room where you sit costing over 2 million, you will want your own person running it not some temp/CONTRACTOR as is going to happen, but the sad thing is, yes its a nice room, but its not a room made for those types of meetings.
8.  this is my tax money just as much as yours, as Gary told ngoc why has no one been fired, well why did George stop work in the board room, and not get fired?
why was George allowed to discuss with ray my marriage and medical problems, why  is George allowed to take av techs around the lake to tell them how things will be?
why has George been allowed to manipulate the techs, contractors and his staff, they are afraid of him.
9.  Has any of the staff told you that of 2 years ago the wireless microphone (frequencies) were sold by the FCC, which means that you could be fined, i told George of this before i left, as they did it with the original frequencies, so cell phones can have more bandwidth.
10.  I enjoyed working there but when the av staff cannot do there job, this is what happens.
11.  WHO IS PAYING FOR ELECTRICAL, WOODWORK, DRYWALL, PAINTING, BE SURE TO ADD THAT COST.
12.  IF PHIL IS A CTS WHY DID HE NOT SEE THE WIRELESS MICS WERE NOT SOLD OFF 2 YRS AGO MY THE FCC, ADD ANOTHER 20K, FOR  JUST 4 WIRELESS HANDHELDS AND LAVS?
13.  Staff Training: Clear Presentations & Mic Technique x OK Training/procedural Issue, MAYBE STAFF TRAINING AND A COUPLE OF UPGRADES IS ALL YOU NEED.
14.  Simplify Rear Round Table  MOUNT CEILING THIS EQUIPMENT WAS BOUGHT IN 2011.
15..Provide Better Lighting From Front, Side and Back of Subjects x OK New cameras will operate better in low light conditions,  THE CAMERAS ARE FINE IS THE LIGHTING AS WAS TOLD TO TOM SPADA WHEN I WAS THERE.
16.  I WILL NOT EVEN BOTHER GOING OVER THE MATRIX AS MOST IF NOT ALL OF THAT CAN HAPPEN NOW.    I WISH YOU LUCK.   MOST IF NOT ALL OF THIS CAN HAPPEN, HOWEVER YOU HAVE NOT GOT THE RIGHT COSTS, NOR THE RIGHT ENGINEERS, NOR HAVE YOU THOUGHT OF THE USER, WHO STILL DONT USE THE EQUIPMENT RIGHT.
HURRY YOU STILL HAVE TIME TO ADD TO THE COST, FIGURE THE ACOUSTICS OUT, AND ASK HOW DID WE GET ENGINEERS WITH NO BOARDROOM EXPERIENCE.

just ask the board if they read employee reports, or any of the tapes, PR’s, expense reports etc.  we have provided links rebuttals but the board, managers just disregard the info, and keep wasting tax money.

http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2014_Published_Meetings/MG55522/AS55533/AI55560/DO55650/DO_55650.pdf

062215 IT Ad Hoc Comm Mins  THE ONLY MEETING HELD NO PUBLIC AND WHOLE REPORT IS BASED ON LIES.

Handouts-Agenda Item 5.2 AV TECH REBUTTAL MORE FUNNY STUFF. read this from av tech.

P Goeltz Release (1) THEY WANT ME TO SIGN THIS FOR MY MISSING STUFF AND BE QUITE ABOUT THE BOARDROOM LIES.

scvwd ray RAYS REBUTTAL 10 28 14

SCVWD PGOELTZ 10 28 2014  SR AV TECH 10 28 14

Resolution Providing for the Notice of Time and Place of the Public Hearing on the Engineer’s Report for the Boardroom Audiovisual Modernization GOLDIE FUNG KAMENJATI  THIS IS PURE LIES, WHY THEY PERSIST ON NOT LISTENING TO  SR TECH AND LISTENING TO LIES LEARNED BY MANAGERS FROM BEAU.

JOE HANDOUT INFO ON BOARDROOM SENT TO JOE JUDGE ALERTING HIM AND OTHERS OF FRAUD ETC.

DiversityAudit2012  GOOD READING EXPLAINS WHY SCVWD IS LIKE IT IS.

 

AUDIO FROM THE ONLY MEETING HELD, ENGINEER LIES AND ASHU LIES CAN BE DOWN LOADED HERE. or watch video i made with rebuttal    …

https://vimeo.com/155258547 SCVWD MEETING NOTES MP3 06-22-15 IT Ad Hoc

https://scvwd.egnyte.com/fl/bpxZ1qv1v9#folder-link/rstewart/06-22-15%20IT%20Ad%20Hoc

 

PLEASE LISTEN TO THE TECH OR ME AND I CAN EXPLAIN WHAT IS INSTALLED HOW AMX CAN HANDLE VOTING AND HOW SYSTEM IS ALREADY SOCIAL MEDIA FRIENDLY.

I CAN EXPLAIN HOW MUCH HAS BEEN SPENT AND WERE THE EQUIPMENT IS. AS CAN THE  AV TECH

SCVWD SELLING ART WITH YOUR TAX DOLLARS????

ARTWORK SCVWD SUPPORTS DURING DROUGHT????

Boardroom Audio Visual Modernization Project Engineer’s Report.

THIS IS THE AUDIO NOTES OF LAST it AD HOC MEETING THEY WERE TO HAVE MANY

https://scvwd.egnyte.com/fl/bpxZ1qv1v9#folder-link/rstewart/06-22-15%20IT%20Ad%20Hoc ad hoc folder

TO DECIDE THE LIES THIS  AUDIO TRANSCRIPT IS FULL OF SCVWD TELLING LIES, JUST LIKE BEAU WHO GOT FIRED FOR LYING SAD THING IS THIS GROUP IS ALL ELECTED BOARD MEMBERS, WE HAVE PROVEN THE IT DEPT LET THE ROOM FAIL SO THEY CAN SPEND ANOTHER 3 MILLION DURING DROUGHT, SOCIAL MEDIA FRIENDLY, LIKE THE BOARD IS GOING TO STOP IN THE MIDDLE OF MEETING TO TAKE A TWITTER QUESTION, PUBLIC COMMENT IS AT THE START, IF YOU CANNOT MAKE IT SEND EMAIL.

OR THAT ONLY 60K HAS BEEN SPENT WHEN THE ROOM COST OVER 3 MILLION AND I DID OVER 250K OF UPGRADES, GEORGE K TOOK THE TANDBERG vc SYSTEM OUT AND NEVER TOLD THE BOARD IT WAS PUT IN PER REQUEST FROM LARRY WILSON 70K.  SO SEE THE LIES DON’T STOP, FUNG, RAVI, JESASS(CAO) ASHU, GK THEY TELL THE CONTRACTOR WHAT TO SAY AND HOW TO LIE, WANT TO KNOW WHY ONLY ONE CONTRACTOR SHOWED UP FOR THE AV BID, THEY DON’T WANT TO DEAL WITH PSYCHOPATHS .  I CAN GO ON AND ON  I MADE THE ROOM DIGITAL, PUT ASSISTED LISTENING, AMX CAN HANDLE VOTING AS GK SAW THE DEMO, AND IF THEY LET THE TECHS DO THE AV NOT THE STAFF AND START MAITANCE, THINGS WOULD WORK, THERE IS OPEN PO’S FOR ANDERSON ENGINEERING FOR AMX WORK, GK BOUGHT OVER 50K OF GEAR FOR MODERNIZATION AND IT SITS.  IF YOU LOOK AT THE PDF OF REQUEST FOR MIC TRAINING NO ONE PERSON ASKED FOR IT WHICH IS THE CAUSE OF MOST PROBLEMS AUDIO WISE, YOU DONT SPEAK SIDEWAYS INTO MIC.

http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2014_Published_Meetings/MG55522/AS55533/AI55560/DO55650/DO_55650.pdf  LISTEN TO THESE LIES

BACKGROUND: The Boardroom’s audiovisual system was designed in 1997 and built in 2000. (UPGRADED UP TILL 2012 UNTIL GK STOPPED WORK ASK THE AV TECH, OVER 250K SPENT) In addition to the board’s own public meetings, the existing system is used for the District’s many internal divisional, unit, and group meetings, and frequently for other general district and community events of a business, educational, outreach, or celebratory nature. The existing legacy analog-based audiovisual system, uses technology designed over 17 years ago and does not provide for enhanced features of an e-voting ( AMX WILL HANDLE E VOTING AS EA MEMBER ALREADY HAS A AMX SCREEN FOR VOTING)and high resolution multi-screen (ALREADY HAVE MULTI SCREEN AND HD IS A WASTE WHEN 1024X 768 IS BEST) viewing, archiving, editing, casting and streaming of digital audio and video signals. ( SYSTEM IS ALREADY DIGITAL AND DIGITALLY RECORDED BOTH AUDIO AND VIDEO IN 2 DIGITAL FORMATS,)This system is not capable of integrating a sophisticated digital e-voting system and related (ALL LIES ITS ALL SET UP AND JUST NEEDS PROGRAMMING AS ANY NEW SYSTEM WOULD)features, nor does it have enough capacity or compatibility to provide for additional multi-signal switching of wired and wireless digital devices that can accommodate multi-scenario featured meetings. The existing system requires dedicated staff resources to insure basic operation during board meetings. ( ANY AV SYSTEM IS JUST LIKE A CONCERT A CREW IS REQUIRED WHO IS GOING TO WORK THE TWITTER FEED?)The reliability of this aged system is unpredictable and on many occasions has experienced audiovisual devices and power-related deficiencies and failures. Because of the new features requirements, technology limitations and exiting issues, the Project scope will completely overhaul the AV system and provide for a modern electronic voting system. THE SYSTEM WOULD WORK FINE WITH TRAINING AND ASK THE TECH TO TELL YOU WHAT THE SYSTEM CAN DO, GK STOPPED WORK SO THEY CAN REBUILD THEY SAY 900K ITS MORE LIKE ANOTHER 3 MILLION, AS THEY ARE NOT INCLUDING SCVWD STAFF TIME

https://scvwd.egnyte.com/fl/bpxZ1qv1v9#folder-link/rstewart/06-22-15%20IT%20Ad%20Hoc

http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2014_Published_Meetings/MG55522/AS55533/AI55560/DO55650/DO_55650.pdf     this report is all based on lies and untruths dont believe the sr tech ask fired temps or the av tech.

http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2014_Published_Meetings/MG55522/AS55533/AI55560/DO55650/DO_55650.pdf

5 thoughts on “SANTA LARA VALLEY WATER Boardroom Audiovisual Modernization Project Engineer’s Report.

  1. https://vimeo.com/155258547 SCVWD MEETING NOTES MP3 06-22-15 IT Ad Hoc

    SCVWD ceo-staff-misled-water-district-board-about-rmc-contracts/ READ AUDIT 2012

    SANTA LARA VALLEY WATER Boardroom Audiovisual Modernization Project Engineer’s Report.


    https://www.youtube.com/watch?v=EVDo3B3ZgKE SCVWD GOLDEN SPIGOT SANTA CLARA VALLEY WATER DISTRICT
    https://tomtolosky.wordpress.com/2015/11/09/scvwd-ceo-staff-misled-water-district-board-about-rmc-contracts-read-audit-2012/ Watch “SCVWD MEETING NOTES MP3 06-22-15 IT Ad Hoc” by @pgoeltz on @Vimeo https://vimeo.com/155258547?ref=tw-share

    #scvwd #valleywater #fraud #fung #sexjokes
    ​CREEK SCVWD GOLDEN SPIGOT 3% ACID FLUORIDE https://youtu.be/FpqgzIZk0cU @YouTube@scvwd @valleywater https://vimeo.com/155258547 NOTES 062215 ITAdHoc

  2. Reblogged this on pgoeltz and commented:

    https://vimeo.com/155258547 SCVWD MEETING NOTES MP3 06-22-15 IT Ad Hoc

    SCVWD ceo-staff-misled-water-district-board-about-rmc-contracts/ READ AUDIT 2012

    SANTA LARA VALLEY WATER Boardroom Audiovisual Modernization Project Engineer’s Report.


    https://www.youtube.com/watch?v=EVDo3B3ZgKE SCVWD GOLDEN SPIGOT SANTA CLARA VALLEY WATER DISTRICT
    https://tomtolosky.wordpress.com/2015/11/09/scvwd-ceo-staff-misled-water-district-board-about-rmc-contracts-read-audit-2012/ Watch “SCVWD MEETING NOTES MP3 06-22-15 IT Ad Hoc” by @pgoeltz on @Vimeo https://vimeo.com/155258547?ref=tw-share

    #scvwd #valleywater #fraud #fung #sexjokes
    ​CREEK SCVWD GOLDEN SPIGOT 3% ACID FLUORIDE https://youtu.be/FpqgzIZk0cU @YouTube@scvwd @valleywater https://vimeo.com/155258547 NOTES 062215 ITAdHoc

  3. Pingback: SANTA LARA VALLEY WATER Boardroom Audiovisual Modernization Project Engineer’s Report. | pgoeltz

  4. Pingback: SCVWD LIES ABOUT BOARDROOM 4 8 16 6PM | tomtolosky

  5. Pingback: SANTA CLARA VALLEY WATER DISTRICT BOARDROOM 3 8 2016 | pgoeltz

Leave a comment