there would be more money for water and infrastructure, but they have lawsuits, and they waste tons of money, lets take the board room which the managers halted all work and decided to build another one the 4th rebuild, this will cost over a million dollars, and all the equipment is within 1-4 yrs old, its falling apart because the manger halted repairs george kamenjati and frank fung, even beau goldie is in on the plot as we took this before the board, but when the golden spigot wants something who cares it tax money. i have emails, people that can poke holes in anything they say..
http://scvwd.granicus.com/MediaPlayer.php?view_id=3&clip_id=1043 ravi acting unit manager time-stamp 2.37 sept 10 13 one ravi is just acting, the system except racks were built in 97 everything has been replaced, go back and see beaus feed back he and others talk 2ft form mic and sideways that’s 1/4 gain into a microphone voting system will integrate into existing amx control system, the system is a mix minus, the older board do not want hearing aids that said the person next to santos cannot be in that speaker, most if not all equipment has been replaced check dates and prs, this is to keep wasting tax dollars, they have not let myself nor the other tech fix anything or adjust so there is problems thousands of brand new equipment will be tossed, the remote gear all brand new tossed, all it takes is xap adjustments and proper mic use, but we are not allowed to talk to the board, they have wire pulled out to make it look bad, the tech there now refuses to have anything to do with the new room which they claim 250k, that does not include conduit, electric, wood work,cement and in house personal. call if you wish its your money and mine, but this is all to keep funding up. I put over 100k in new gear in there from 2000 on, look in the store room untouched equipment, the conflict is ravi, george Kamenjati no nothings, the tech is not 16yrs old just wanting to sell equipment, and no oversight, its a church in there not a board room. the golden place is just that a pit.
Its a public room i can show you everything that needs adjusting or replace with equipment bought soon to be junked, sad thing is they listen to themselves, but refuse to show directors how to talk into a microphone, or allow adjustments, we spent over 250k last 10 yrs in improvements, longer mics, lighted, a control system that voting can be added to, new wireless, video conferencing(over 55k) used once, but taken out so they can say we don’t have it, even though ever computer can do it now, tandberg integrated with a system, ravi claims overhead speakers are the problem, those were removed, 10 yrs ago, Beyer intercoms were bought 50k for committee meeting, going to be junked for new ones, 80% of what is there is new and usable with adjustments and proper mic use, mic are to be used to talk straight into. check scvwd record on lawsuits, firings, and other issues, building parks next to directors house, paying for hearing aids, food and expenses go unchecked. even my medical records were told to many at the district, but that was ok, no issue with that even thou there are witnesses, harassment, retaliation on other IT workers who are to afraid to talk, this is the attitude at the district.
reads the 2012 diversity audit about management, you can sue them if your unclassified as they make 250k plus and can afford legal . The video below at item 1.4 you can also get the enclosed pdf we submitted, on there valley.org site if not ask, we complained to 22 managers, but after reading the audit i see why they do nothing, over 1 million has been spent on the old board room, which is called the golden palace, or golden spigot as they waste tax money when they should go to water. now they say the boardroom does not work, why gk ordered us not to touch or fix a thing, even though as the SR IT tech i had spent another 20k on hardware that sits, 10k in software contracts we were told to forget about. the bidding paperwork is almost done, they will release no foia docs, even though this same papers are given to the public at ever meeting on any job. that was in 2012 there is 60k worth of gear in the warehouse unused untouched as the new manager does not want to deal with it???? upgraded mixing system and other gear to be on internet in 06 still best equipment, VC put in 08 tandberg never used, and taken out so GK could say we don’t have it(57k) the room is a church not a board room 100k camera for streaming being junked, a amx video controller with joy stick 20k, bought 2012 junked, the bosses tell the big boss nothing but lies, the managers are paid to be there but everyday 1-2 hr lunch when 30 is the norm. After i spoke and even before i tried to slow down the waste, but they have ways to keep tax payer funding high, even in a drought, were funds should be for water.
dec 11th 2012 item 1.4 public comment were i bring items to light. pdf or more doc i can supply or ask them.
http://scvwd.granicus.com/MediaPlayer.php?view_id=3&clip_id=962
OVER 1 MILLION, BUT ASK PEOPLE TO CONSERVE WATER, dont you think a room that has 80% new equipment in it would be just fine in the time of need for money to be spent elsewhere? like water, they are sneaking this through no public comment, debate etc.
Posted on July 22, 2014
http://www.takepart.com/article/2014/07/15/nestle-arrowhead-cabazon-california-drought?cmpid=organic-share-twitter WHERE IS THE LEAD AGENCY @SCVWD THE GOLDEN SPIGOT ON THIS, OH THAT’S RIGHT THEY WANT TO SPEND ANOTHER MILLION OF TAX PAYER MONEY TO BUILD ANOTHER BOARD ROOM, WHEN THE MANAGER TOLD THE TECHS NOT TO TOUCH OR REPAIR ANYTHING SO THEY CAN REPLACE IT EVEN THOUGH ITS 85% NEW Santa Clara Valley Water District WANT EMAILS, PO, AND MORE PROOF OF IT MISMANAGEMENT? WONDER WHY THERE ARE ON THE 4TH IT MANAGER. THERE WILL BE A PUBLIC HEARING I WILL BE THERE TO SHOW YOU NOTHING IS WRONG WITH THE OLD, AND SHOW THE PUBLIC MANY DOCUMENTS THEY DON’T WANT YOU TO SEE, LIKE AUDIT 2012.