@SCVWD THE GOLDEN SPIGOT

@SCVWD @VALLEYWATER @GeorgEKamenjati THE LEADER IN MANAGERS LYING. AUDIT 2012 ASKING FOR 1 MIL FOR YET ANOTHER BOARD ROOM.. WHAT IS SAD IS NO ONE CARES, ITS JUST TAXPAYERS MONEY
https://pgoeltz.wordpress.com/2014/07/22/scvwd-the-golden-spigot/
http://scvwd.granicus.com/MediaPlayer.php?view_id=3&clip_id=1043 Ravi acting unit manager timestamp 2.37 Sept 10 13 one ravi is just acting, the system except racks were built in 97 everything has been replaced, go back and see beaus feed back he and others talk 2ft form mic and sideways that’s 1/4 gain into a microphone. (NOTICE EVEN THE ceo HAS NO IDEA ON MICROPHONE USAGE, WHY ??IT MANAGERS HAVE TOLD THEM NOTHING AND THIS IS WHAT U GET WRONG!!!, PROPER MIC USE AND XAP ADJUSTMENTS, THE GOLDEN SPIGOT IS VERY GOOD @ FALSE FLAG TO JUSTIFY… Voting system will integrate into existing amx control system, the system is a mix minus, the older board do not want hearing aids that said the person next to santos cannot be in that speaker, most if not all equipment has been replaced check dates and prs, this is to keep wasting tax dollars, they have not let myself nor the other tech fix anything or adjust so there is problems thousands of brand new equipment will be tossed, the remote gear all brand new tossed, all it takes is xap adjustments and proper mic use, but we are not allowed to talk to the board, they have wire pulled out to make it look bad, the tech there now refuses to have anything to do with the new room which they claim 250k, that does not include conduit, electric, wood work,cement and in house personal. call if you wish its your money and mine, but this is all to keep funding up. I put over 100k in new gear in there from 2000 on, look in the store room untouched equipment, the conflict is ravi, george Kamenjati no nothings, the tech is not 16yrs old just wanting to sell equipment, and no oversight, its a church in there not a board room. the golden place is just that a pit.

pgoeltz

http://www.takepart.com/article/2014/07/15/nestle-arrowhead-cabazon-california-drought?cmpid=organic-share-twitter WHERE IS THE LEAD AGENCY @SCVWD THE GOLDEN SPIGOT ON THIS, OH THAT’S RIGHT THEY WANT TO SPEND ANOTHER MILLION OF TAX PAYER MONEY TO BUILD ANOTHER BOARD ROOM, WHEN THE MANAGER TOLD THE TECHS NOT TO TOUCH OR REPAIR ANYTHING SO THEY CAN REPLACE IT EVEN THOUGH ITS 85% NEW Santa Clara Valley Water District WANT EMAILS, PO, AND MORE PROOF OF IT MISMANAGEMENT? WONDER WHY THERE ARE ON THE 4TH IT MANAGER. THERE WILL BE A PUBLIC HEARING I WILL BE THERE TO SHOW YOU NOTHING IS WRONG WITH THE OLD, AND SHOW THE PUBLIC MANY DOCUMENTS THEY DON’T WANT YOU TO SEE, LIKE AUDIT 2012.

  1. @VALLEYWATER Boardroom upgrade- #SCVWD public hearing July 9th agenda routing for 8/12 Board, hold the public hearing, WASTE OF TAX$$$$
    COMING SOON FULL STORY ASK I AND WILL TELL WERE WASTE IS ANOTHER 1 MILLION DURING DROUGHT

View original post 8,305 more words

1 thought on “@SCVWD THE GOLDEN SPIGOT

  1. Pingback: #SANTACLARAVALLEYWATER DRAUGHT SUFFERS BUT BUILD 1 MILLION NEW BOARDROOM | pgoeltz

Leave a comment