Creator Saito, Miki grateful dead archive

https://www.gdao.org/solr-search/results/index?q=39_s:%22Saito,%20Miki%22

Search Results

63 results

Decorated envelope

Decorated envelope (Envelope)

Creator:

Decorated envelope

Decorated envelope (Envelope)

Creator:

Decorated envelope

Decorated envelope (Envelope)

Creator:

Letter with artwork

Letter with artwork (Fan Art)

Creator:

Advertisements

VALLEYWATER WORKS THIS WAY

US Lost in Afghanistan, but Did Manage to Make Afghanistan the World’s Top Heroin Exporter

AFGHANISTAN-UNREST-DRUGS

Afghanistan has quickly become the world’s leader in smuggling and exporting heroin thanks to U.S. occupation there. Few are aware of the history of the CIA’s running illegal drugs internationally.

GET THE BEST IN INDEPENDENT NEWS AND ACTIVISM DELIVERED TO YOUR INBOX

I am already receiving the NationofChange newsletter.

NATIONOFCHANGE IS READER-SUPPORTED

The content you are about to read is brought to you by readers like you.

NationofChange works tirelessly to promote progressive change through positive action.

We don’t run ads on our site and we don’t accept corporate funding. We are powered by the people for the people.

If you like what you see, please consider a donation to help us continue operations. We are a 501(c)3 nonprofit and your donation is tax-deductible.Thank you!

I already donated this month.


Afghan Brigadier General Abdul Sama was accused recently of smuggling over 40 pounds of heroin.

It should come as no surprise that an Afghan general was caught smuggling heroin, the surprise is that any high official in that country should be charged with a crime for profiting from the trade in illegal drugs while under the watchful eye of American forces.

Under American occupation, Afghanistan quickly became the world’s leader in opium production, producing over 90% of the world’s supply. The Taliban had almost shut down opium production prior to the US invasion in 2001 to the chagrin of international drug runners, and no doubt the international banking industry, which earns big profits laundering billions of dollars in illegal drug money annually. Illegal drugs account for about 8% of all international trade.

Few Americans are aware of the long history of the CIA’s running illegal drugs internationally, thanks to the untiring efforts of the mainstream press. We’re citizens aware, few would be surprised that heroin production has skyrocketed under US occupation of Afghanistan.

The tragic case of journalist Gary Webb of the San Jose Mercury News is a case in point, and represents perhaps the widest known attempt at suppressing the story of CIA drug-running endeavors, with the mainstream US press shamelessly and dutifully attacking Webb for attempting to expose the inconvenient truth.

That truth: in the 1980’s, the CIA was actively shipping cocaine from Central America into the USA using its own “airline” in order to earn money to circumvent a Congressional ban on continued support for the terrorist Contras, a Reagan-administration-backed counterinsurgency seeking to overthrow democracy in Nicaragua on behalf of US ruling interests. Webb lost his job, and was blackballed from his profession for telling the truth and eventually either was murdered or committed suicide from the pressures our corrupt system can apply against a citizen who blows the whistle.

Former Drug Enforcement Administration (DEA) official Michael Levine wrote that he discovered heroin was being smuggled into the USA inside the bodies of US troops who had died in Vietnam during the sixties. After reporting this ghoulish information, he was transferred and told that it was a CIA operation and he should shut his mouth about it.

After being transferred to South America, Levine then reported on massive cocaine smuggling and was again told to shut his mouth as it too was a CIA operation and he should go along with the program.

Levine eventually realized that much international drug smuggling into the US appears to be under the control of the CIA, and he was wasting his time, so resigned from the DEA.

Levine states without hesitation that “The CIA has long been a major supporter of the people and organizations responsible for supplying drugs to this country. Time and time again, I discovered that various people against whom we were trying to build a case were regarded as assets by the CIA. Of course, at that time those ‘assets’ were described as allies in the Cold War, but my DEA sources tell me that this remains the case even now that the Cold War is over.”

The US government pretends to care about eradicating opium production in Afghanistan, while production soars to record levels. Can this be an accident?

The largest marketplace for illegal drugs continues to be the United States, despite a decades-long so-called “war on drugs.” Can this be an accident?

And can it be an accident that between 2002 and 2013, the 11 years that the US has been occupying and fighting the Taliban in Afghanistan,?

Recall that when the government wanted to stop the recent anti-banker democracy movement known as “Occupy,” it did so in a matter of months, showing clearly where its priorities and capabilities lie. As was exposed in ThisCantBeHappening!, the Obama Administration coordinated efforts nationally with individual cities, where tear gas, beatings, pepper spray, jailing and other tactics were used to deny the right of the people to peaceably assemble. There was even a bizarre plot in Houston to have leaders of the small Occupy movement there murdered using “suppressed rifle fire” –- a plot the FBI knew about, but did nothing to prevent. (Apparently that plan, whose conspirators were never identified publicly, was called off because Occupy famously had no “leaders” who could be targeted.)

That the US government cannot similarly crack down successfully on the annual importation of billions of dollars worth of illegal drugs should cause anyone not comatose to at least question the system.

Our motto should be “Leave no bankster behind.” We know they do buy our politicians, with President Obama having received a record amount of campaign funding in 2008 from the banking industry shortly before he pushed through the massive bailout on their behalf.

As long as international banking makes billions of dollars from the illegal narcotics trade, we can expect the “war on drugs” to be as much of a fraud as the profitable “war on terrorism,” whose contractors also supply those who run our government with massive campaign financing, ensuring we will not soon run out of either drugs or acts of terror (the latter mostly contrived by government agents and paid informants).

ORLANDO TIED TO @SCVWD GEORGE KAMENJAITI

MIB

Orlando nightclub massacre eyewitnesses: ‘More than one shooter, snipers fired at police, someone blocked exits’

© AP
The back of the Pulse nightclub in Orlando on Sunday, June 12. Police say they used an APC to make these holes in the wall, through which many surviving hostages escaped. It’s undisclosed who made the bullet holes around the larger holes.

Yet another appalling mass murder in the US, the bloodiest yet, has once again focused world media attention on the Indispensable Nation. 50 dead, 53 wounded, and all the work of one ISIS-sympathizing, rabidly homophobic (though closet gay, apparently), Muslim-American, tax-paying, Mecca-visiting (yet non-religious), divorced, ‘disturbed’, ‘gentle’, NYPD-loving, America-hating, father-of-one terrorist working a steady job for 9 years with the world’s biggest private security firm.

An Everyman for our times then, it would seem.

The story goes that, at 2am on Sunday 12 June 2016, 29-year-old Omar Mateen walked into a dark nightclub packed with 320 people having a good time. Mateen is carrying an AR-15 rifle and 30 magazines of ammunition on his person. In the dark, beneath the flashing and strobing lights, he begins shooting and goes on to reload and empty his AR-15 rifle 30 times, firing nearly 1,000 rounds of .223 ammunition. In the process, he achieves the remarkable feat of killing or injuring one third of the people around him, the majority of his victims being shot multiple times, some as many as 12 times. And he does all this in under 7 minutes. Alone.

That, dear readers, is the ‘official story’, aka, ‘all the news that’s fit to print’.

Here’s the list of victims:

  • Edward Sotomayor Jr., 34
  • Stanley Almodovar III, 23
  • Luis Omar Ocasio-Capo, 20
  • Juan Ramon Guerrero, 22
  • Kimberly Morris, 37
  • Luis S. Vielma, 22
  • Eddie Jamoldroy Justice, 30
  • Amanda Alvear, 25
  • Enrique L. Rios Jr., 25
  • Jean Carlos Mendez Perez, 35
  • Christopher Andrew Leinonen, 32
  • Jonathan Antonio Camuy Vega, 24
  • Javier Jorge-Reyes, 40
  • Luis Daniel Wilson-Leon, 37
  • Tevin Eugene Crosby, 25
  • Peter O. Gonzalez-Cruz, 22
  • Darryl Roman Burt II, 29
  • Deonka Deidra Drayton, 32
  • Alejandro Barrios Martinez, 21
  • Anthony Luis Laureanodisla, 25
  • Geraldo A. Ortiz-Jimenez, 25
  • Franky Jimmy Dejesus Velazquez, 50
  • Martin Benitez Torres, 33
  • Mercedez Marisol Flores, 26
  • Xavier Emmanuel Serrano Rosado, 35
  • Gilberto Ramon Silva Menendez, 25
  • Simon Adrian Carrillo Fernandez, 31
  • Oscar A. Aracena-Montero, 26
  • Miguel Angel Honorato, 30
  • Joel Rayon Paniagua, 32
  • Jason Benjamin Josaphat, 19
  • Cory James Connell, 21
  • Juan P. Rivera Velazquez, 37
  • Luis Daniel Conde, 39
  • Shane Evan Tomlinson, 33
  • Juan Chevez-Martinez, 25
  • Eric Ivan Ortiz-Rivera, 36
  • Jerald Arthur Wright, 31
  • Leroy Valentin Fernandez, 25
  • Jean C. Nives Rodriguez, 27
  • Rodolfo Ayala-Ayala, 33
  • Brenda Lee Marquez McCool, 49
  • Yilmary Rodriguez Sulivan, 24
  • Christopher Andrew Leinonen, 32
  • Angel L. Candelario-Padro, 28
  • Frank Hernandez, 27
  • Paul Terrell Henry, 41
  • Antonio Davon Brown, 29
  • Christopher Joseph Sanfeliz, 24
  • Akyra Murray, 18

Now let’s take a closer look at The Timeline (one version of it anyway), as reported by CNN:

The first shots were fired just after 2am, presumably at patrons inside the club. A police officer was on duty at, or in the vicinity of, the club. He was initially joined by two more police officers and they exchanged gunfire with ‘the shooter’, who was apparently outside the club at this point, but who then ran back into the club. How he got into the club in the first place, armed to the gills, isn’t disclosed.

Anyway, the first 3 cops were joined within minutes by “about 100 officers from the Orange County Sheriff’s Office and the Orlando Police Department.” At 2:09 am, nightclub employees sent a message via Facebook telling patrons to “get out of Pulse and keep running.” Then nothing happened for 3 hours, ostensibly because the remaining patrons were being held hostage. Police officials said they had to hang around all that time “to access the situation, get armored vehicles on the scene and make sure they had enough personnel.”

Access the situation? That’s either a typo and it should read ‘assess the situation’, or too many of those cops were idling in the nearby Dunkin’ Donuts.

The only thing of note, we’re told, that took place during that time was that the shooter called 911 to tell police that he was doing this for the leader of ISIS, who he named and pledged loyalty to, before expressing solidarity with the supposed perpetrators of the Boston Marathon bombings (which took place in 2013, before ‘ISIS’ existed) and solidarity with the Florida man who died in 2014 as a suicide bomber in Syria for Al-Nusra Front (a terrorist group the US State Department is working around the clock to distinguish from ISIS as ‘moderate’ because it is arming and funding it).

At about 5 am, SWAT police units used an armored vehicle to smash their way into the club, confront the suspect “in the doorway and shoot and kill him.” Another variant of that ending has the ‘lone wolf’ engage in a one-hour shoot out with SWAT units, subjecting them to “a hail of bullets” before he is killed. Job done, everyone goes home.

Florida governor Rick Scott then gave the ‘Orlando Strong’ speech…

“This was an attack on our people, an attack on Orlando, an attack on Florida, an attack on America, an attack on all of us.”

US president Barack Obama followed up with the ‘Love and Light’ speech…

“In the face of hate and violence, we will love one another. We will not give in to fear or turn against each other, instead we will stand united as Americans to protect our people, to defend our nation, and take action against those who threaten us.”

And that’s it; end of story.

There are, however, a few small details to iron out, like squaring the above with the following testimony provided by several people who were actually there at the club that night:

Part 1

Part 2

Multiple shooters coordinating a tactical assault on the club? Keeping exits blocked to maximize the death toll? Snipers keeping the cops at bay?

Who were these gunmen? Where did they go? Who do they work for? And more to the point, why isn’t the media reporting this, at least alongside the incredible story of a lone wolf whose astonishing kill rate put Hollywood action movie ‘heroes’ to shame?

The very fact that the Orlando mass shooting simultaneously targeted pretty much all of America’s fault lines points to the psychology of those behind it. We’re not looking at wayward chance here; we’re looking at someone or something that knows Americans better than they know themselves (and no one knows Americans better than their authority figures).

This is the terrorists (the actual ones) once again ‘hitting the paranoia switch’, as psychologist Martha Stout describes in her seminal work, reviewed here.

Then again, never mind; these are just trivial details and ‘conspiratorial’ speculation (based on eyewitness testimony). What’s really important is that everyone gets together to cry crocodile tears for people they wouldn’t ordinarily give a damn about, pledge their undying support for the military-industrial complex, and remember to vote this Fall for the most authoritarian ‘leader’ (take your pick between Killary and raging baby-man Trump) who will lead Americans (and the world) further down the road of global chaos and, quite possibly, ultimate destruction.

Virginia Gov. Terry McAuliffe Invited Chinese Donor to Hillary Clinton’s Home — TIME

Virginia Gov. Terry McAuliffe invited the Chinese businessman whose donations to him have been named as a focus of Justice Department investigators to a 2013 fundraiser at Hillary Clinton’s personal Washington, D.C., residence. Wang Wenliang, a Chinese national with U.S. permanent residency, briefly shook Clinton’s hand at the Sept. 30 event, a representative for Wang…

via Virginia Gov. Terry McAuliffe Invited Chinese Donor to Hillary Clinton’s Home — TIME

SCVWD waste fraud @SCVWD 5 24 16 6pm

                   thanks tom @scvwd  

Attachment 6 Handout 2.8-A – P  TO COB WITH NOTES NOT FORMATED?? FORMATTED BELOW.

Attachment 7 Handout 2.8-B – P  THIS WAS TO REPLACE IT SAME THING LEAVES MESSAGE.

DEAR CHAIR, DIRECTORS AND STAFF!
paul goeltz
Why a rework/new approach to the same Boardroom upgrade that already occurred ?? That is misleading to
the public and not transparent as you have received multiple documentation, in the last couple of years .
http://scvwd.granicus.com/MediaPlayer.php?view_id=3&clip_id=1182
IT Adhoc committee -NO responsible questions were asked only ” when will it be done by Director
Keegan for the A/V Boardroom Upgrade. Even Dug Muirhead saw no need for HD!
Where was the outspoken Director Keegan that appeared on NBC investigative report on the RMC scandal? ” I
don’t think this has been the most transparent process” on that news segment, can you confidently say that
the Board Room upgrade process has been completely transparent?
If you require more info all pdfs, notes are supplied with links below, all links are available online.

Attachment 8 Handout 2.8-C – R  THE AV TECH STATEMENT

Ray Corral Audio Visual Specialist 5-19-2016 Re: Public Hearing on the Engineer’s Report and Resolution Approving the Engineer’s report on the Boardroom Technology Upgrade, Project No. 73274010 . Public hearing: 5-24-2016, Item 2.8 Directors, Since I have submitted documentation in the past on the Audio Visual System in the Boardroom, I wanted to just clarify that my work currently on the A/V system working with management and the contractor ( to make sure the documentation and design was in line together) was in lieu of insubordination. The upcoming work on this project after it is passed should not be taken that I have done an about face and I am now supporting the upgrade now currently. I value my work and integrity and still stand by my past comments that have been submitted to the Board of Directors meetings. Thanks! Ray Corral

          SCVWD waste fraud @SCVWD 5 24 16 6pm

SORRY SCVWD DOES THIS TO CONFUSE THE PUBLIC AND WASTER YOUR MONEY!

BE ON THE LOOKOUT A PERSON WHO RETIRED FROM SCVWD BECAUSE OF FRANK FUNG AND GEORGE KAMENJATI.

WELCOME TO THE GOLDEN SPIGOT, WHERE WASTE, FRAUD AND ABUSE IS RAMPANT!

THEY NOT ONLY LIE ABOUT BOARDROOM COST, REPAIRS, HD, BLUERAY(WHICH HAS NEVER BEEN USED) AND WHO WANTS TO LOOK AT CRABBY OLD PEOPLE IN HD WASTE YOUR TAX DOLLAR? THEY SAY 600K WATCH YOUR TAX DOLLAR GO TO 2 MILLION IF THEY CAN GET THE ROOM DONE IN 2 MONTHS, WE WILL SEE WHO HAS THE LAST LAUGH.

DEC 11 2012 

http://scvwd.granicus.com/MediaPlayer.php?view_id=3&clip_id=962&meta_id=105367 ITEM 1.4 FIRST SPEACH    

http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2012_Published_Meetings//MG47843/AS47844/AS47848/AI49234/DO49236/1.PDF

 

MK the pdf could have been scanned and posted, i have seen many others larger than mine, with maps etc.
so if i provide links as they are all public can those be scanned and posted?  on
my speech is below, they have all been online before???? IN THE EVENT THAT MY TAXI OR RIDE TO SCVWD IS LATE WILL THIS BE READ AS OTHERS ARE READ?
1/22/2016

you posted 2 large pdfs

https://scvwd.legistar.com/LegislationDetail.aspx?ID=2573905&GUID=59713FE2-C88D-4193-8EC0-56C2E5FC4C9D&Options=&Search=

  this has item 8.1 a and b

https://pgoeltz.files.wordpress.com/2014/11/scvwd-pgoeltz-10-28-2014.pdf
https://pgoeltz.files.wordpress.com/2014/11/scvwd-ray-10-28-2014.pdf
https://pgoeltz.files.wordpress.com/2015/07/handouts-agenda-item-5-2.pdf
https://pgoeltz.files.wordpress.com/2015/06/joe-handout.pdf
https://pgoeltz.files.wordpress.com/2015/06/diversityaudit2012.pdf
https://pgoeltz.files.wordpress.com/2015/07/handouts-agenda-item-5-2.pdf
http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2012_Published_Meetings//MG47843/AS47844/AS47848/AI49234/DO49236/1.PDF

i did not see my pdf with my letter as you said it would be???  all i saw in the packet was my letter?
so  which pdf were too large? could not have been all of them
do i need to resend all the pdf’s again?
DEAR CHAIR, DIRECTORS AND STAFF!
 
1. DID WE NOT OPEN THE PUBLIC HEARING BEFORE ON
FC 1025 (09-20-13)
Meeting Date:
10-14-14
Agenda Item:
Unclassified Manager:
S. Tikekar
Extension:
2424
Director(s):

2. WHY ANOTHER PUBLIC HEARING?

NOT THAT THE PUBLIC COMMENT IS WANTED OR EVER USED?
LIKE FLUORIDE, ETC.
Resolution Providing for the Notice of Time and Place of the Public Hearing on the
Engineer’s Report for the Boardroom Audiovisual Modernization Project, Project No.
60101011 (San Jose) THIS WAS NEVER CLOSED?? FROM 10/14
3. THANK YOU FOR LISTENING TO YOUR OWN EMPLOYEES, PUBLIC COMMENT.
4. IT’S APPARENT YOU RATHER SPEND MONEY WITH TOTAL DISREGARD FOR
THE HOMEOWNER!
5. ALL I CAN SAY IS GOOD LUCK, YOU HAVE KAMENJATIS
(IT) HANDPICKED FIRM TELLING YOU WANT YOU WANT TO HEAR!
6. GOOD LUCK USING SKYPE, INSTEAD OF YOUR TOP NOTCH TANDBERG 5000!

WHICH USES DEDICATED ISDN 1ST

and

INTERNET

2ND BUT NO LOSS WITH

ISDN SKYPE IS FOR HOMES NOT WORK.
7. AND GOOD LUCK KEEP IT UNDER A MILLION DOLLARS!
8. IF YOU WOULD HAVE LISTENED TO THE TECH AND COMMENTS YOU WOULD
SEE BLUERAY HAS NEVER BEEN USED, THE LCD ARE ALREADY DIGITAL!
9. AND YOU ARE TOSSING 100k OF EQUIPMENT OUT.
10. THE DISTRICT HAS NOT SPENT 183K ON REPAIRS….. BUT UPGRADES, IF
YOU WOULD LISTEN!
“IT has spent over $185,000 on Band-Aids, and repairs since 2006” this is upgrades pull the pr.
11. OVER 40K OF EQUIPMENT WILL BE TOSSED OUT GK HAD ORDERED IN
2012, SHAME. AND TONS OF GOOD RACK EQUIPMENT ALL DIGITAL.
12. WHAT IS FUNNY, IS YOUR TIMELINE, AND BROADCAST, HD (GOOD LUCK
ON THOSE CLOSE UP SHOTS)!
13. SURE THE DISTRICT HAS THE BANDWIDTH, BUT WHAT ABOUT THE
PUBLIC?
14. THE CABLE COMPANY IS ALREADY WIRED INTO THE BUILDING YOU
SHOULD HAVE ASKED?
15. ALL I CAN SAY AND OTHERS ALSO, IS GOOD LUCK ON
PROGRAMMING( DON’T COPY ANDERSON WORK) AND THE ACOUSTICS! AND
MANY OTHER ITEMS, AS THIS IS RUSHED THROUGH, YOU HAVE NO IDEA
WHAT YOU ARE GETTING INTO, BUT AT LEAST YOU CAN FIRE THE 5TH IT
MANAGER

16. AND NO QUESTION

s

FOR STAFF OR THE ENGINEER, WE HAVE SHOWN

TONS OF DOCUMENTS AS DUG MUIRHEAD HAS BROUGHT

TO LIGHT THE SHADY MASTER PLANS AND FUNDS

.
If you have ever been hooded winked it’s now, why do you think ray and i have been submitting papers on what kamenjati/fung/ravi.and ashu have done( stopped maintenance so the room will fail, paid contracts that have not been done just like rmc.)
has anyone from it staff told you about speaking into a microphone ( have they let me explain it or ray, have you seen members of Congress speak on c span? they speak directly into the mic, if others are not speaking directly into the mic, that also means YOU will not be able to hear them)   not saying your wrong but staff has not instructed you on use, nor have they let ray fix problems.  I was told when i was there not to talk to you about equipment.
 

The Stakeholders Matrix that is submitted for Item 8.1 for Board Meeting 3-8-2016 is from 12-6-2013. Where is the Stakeholders matrix mentioned in the Handout from the IT Ad Hoc Committee meeting June 22, 2015 item 5.2 (page 79) which is dated 4-1-15? Why is the updated version not submitted presently for the agenda item for the Board Members and Publics information?  I could go on and on but this is not read and you due as you please, so good luck.

thank you……
PAUL GOELTZ
 
WISH TO SPEAK, DURING PUBLIC AND ON THIS ITEM

IMG_6121

DSC00516

This is your old av Sr tech, if you have ever been hooded winked it’s now, why do you think ray and i have been submitting papers on what kamenjati/fung/ravi.and ashu have done( stopped maintenance so the room will fail, paid contracts that have not been done just like rmc.)
has anyone from it staff told you about speaking into a microphone ( have they let me explain it or ray, have you seen members of Congress speak on c span? they speak directly into the mic, if others are not speaking directly into the mic, that also means YOU will not be able to hear them)   not saying your wrong but staff has not instructed you on use, nor have they let ray fix problems.  I was told when i was there not to talk to you about equipment.
 

The Stakeholders Matrix that is submitted for Item 8.1 for Board Meeting 3-8-2016 is from 12-6-2013. Where is the Stakeholders matrix mentioned in the Handout from the IT Ad Hoc Committee meeting June 22, 2015 item 5.2 (page 79) which is dated 4-1-15? Why is the updated version not submitted presently for the agenda item for the Board Members and Publics information?

Agenda

http://valleywater.org/About/ITAdHocAgendaMinutes.aspx


I WILL COME TO ANY MEETING AND SHOW YOU THE EQUIPMENT, THE PURCHASE PAPERS, AND SUPPLY  CONTRACTORS THAT WILL TELL YOU WE CAN SUPPORT THIS SYSTEM, OR WE INSTALLED THAT EQUIPMENT.
1. Has staff explained that the amx system can do voting, and request to speak as it does now. and that there is an open po with the programmer to have joystick control of ea camera,(( but not done as GK stopped work/SEE EMAIL)  Ask about the 10k of amx processing equipment gk had me buy before i retired/was forced out, but never installed)
2.  HD is not the answer as most people do not have fast internet connections and its bells  and whistles,  flat panels, you have flat panels.
3.  Has staff explained if you want to Skype you can do it now as the room is full of computers hooked to the system.  all you need is a staff person to handle it, that’s free, just download app, but you don’t need Skype, you have a video conferencing system(tandberg now Cisco)( can handle ip, isdn and phone calls  COST 77k$ per Larry wilson).


4.  Has staff told you that people can already call in as we installed a state of the art digital video conferencing system,  this equipment is still up to date.
5.  Has staff been truthful in say the system is 100 % analog no i replaced 75% of the audio and video processing so it is digital, as is the recording of the meetings  both video and audio.  This system can also record committee meetings, just turn cameras, and start recording. this is also digital video record, and audio is also captured on sd cards.  Also digital.
6.  HAS staff explained to you that we can do split screens, we can enlarge images, we can send, hook up and piece of equipment that comes into that board room, from digital to analog.
7. Has staff explained what the district cost will be, you cannot get that room to be rebuilt on 700k plus add the engineer’s cost, staff time already, and by the time the punch list is worked out it will be like the first board room where you sit costing over 2 million, you will want your own person running it not some temp/CONTRACTOR as is going to happen, but the sad thing is, yes its a nice room, but its not a room made for those types of meetings.
8.  This is my tax money just as much as yours, as Gary told ngoc why has nobody been fired, well why did George stop work in the board room, and not get fired? see the email in attachments.
why was George allowed to discuss with ray my marriage and medical problems, why  is George allowed to take av techs around the lake to tell them how things will be?
why has George been allowed to manipulate the techs, contractors and his staff, they are afraid of him.
9.  Has any of the staff told you that of 2 years ago the wireless microphone (frequencies) were sold by the FCC, which means that you could be fined, i told George of this before i left, as they did it with the original frequencies, so cell phones can have more bandwidth.
10.  I enjoyed working here but when the av MANAGEMENT cannot do there job, this is what happens.
11.  WHO IS PAYING FOR ELECTRICAL, WOODWORK, DRYWALL, PAINTING, BE SURE TO ADD THAT COST.
12.  IF PHIL IS A CTS WHY DID HE NOT SEE THE WIRELESS MICS WERE NOT SOLD OFF 2 YRS AGO MY THE FCC, ADD ANOTHER 20K, FOR  JUST 4 WIRELESS HANDHELDS AND LAVS?
13.  Staff Training: Clear Presentations & Mic Technique x OK Training/procedural Issue, MAYBE STAFF TRAINING AND A COUPLE OF UPGRADES IS ALL YOU NEED. Also what wrong with the beyer goosenecks, its what the board wanted, and if told how to use them they work fine.
14.  Simplify Rear Round Table  MOUNT CEILING THIS EQUIPMENT WAS BOUGHT IN 2011.
15..Provide Better Lighting From Front, Side and Back of Subjects x OK New cameras will operate better in low light conditions,  THE CAMERAS ARE FINE IS THE LIGHTING AS WAS TOLD TO TOM SPADA WHEN I WAS THERE.
16.  I WILL NOT EVEN BOTHER GOING OVER THE MATRIX AS MOST IF NOT ALL OF THAT CAN HAPPEN NOW.   IF YOU WOULD HAVE LISTEN TO THE AV TECH INPUTS (SEE HANDOUT), THEN MAYBE YOU MIGHT BE CLOSE.   I WISH YOU LUCK.   MOST IF NOT ALL OF THIS CAN HAPPEN NOW,  HOWEVER YOU HAVE NOT GOT THE RIGHT COSTS, NOR THE RIGHT ENGINEERS, NOR HAVE YOU THOUGHT OF THE USER’s, WHO STILL DON’T USE THE EQUIPMENT RIGHT. NOR HAVE YOU ASKED STAFF WHAT CAN THIS EQUIPMENT DO?
HURRY YOU STILL HAVE TIME TO ADD TO THE COST, FIGURE THE ACOUSTICS OUT, AND ASK HOW DID WE GET ENGINEERS WITH NO BOARDROOM EXPERIENCE.  Remember if you cannot grasp simple equipment, how will you manage higher tech?
Does staff and board  read employee reports, or any of the tapes, PR’s, expense reports etc.  we have provided links rebuttals but the board, managers just disregard the info, and keep wasting tax money.
 

AS DUG MUIRHEAD SAID YES I SAW THE SYSTEM break, SO IT SHOULD BE REPLACED, WELL WHAT WAS THE CAUSE OF THAT, GEORGE KAMENJATI STOPPED ALL WORK IN THE ROOM SO THINGS WILL FAIL, HE WOULD NOT EVEN LET RAY GO PICK UP THE TECH DRAWINGS FROM ME AT HOME, NOR GET ALL THE KEYS.

BOARD OF DIRECTORS RESOLUTION NO. 16- PROVIDING FOR THE NOTICE OF TIME AND PLACE OF PUBLIC HEARING ON THE ENGINEER’S REPORT FOR THE BOARDROOM TECHNOLOGY UPGRADE PROJECT WHEREAS, the Santa Clara Valley Water District (District) has been duly and regularly established and exists pursuant to the provisions of the Santa Clara Valley Water District Act; and WHEREAS, the District has proceeded with feasibility and alternatives analysis for the Project objectives to be attained, and has documented the alternatives analysis and decision criteria and comparisons in a Planning Study Report prepared by the District’s Information Technology Staff and dated May 10th, 2016; and WHEREAS, on the 10th day of May 2016, the Engineer’s Report for the Proposed Project prepared by the Santa Clara Valley Water District’s Information Technology Staff, titled “Boardroom Technology Upgrade” and dated April 12th, 2016, was made available to the Board of Directors, showing: 1. A general description of the proposed Project; 2. A general description and maps showing the location of the proposed Project; and 3. An estimate of the cost of the proposed Project and means of financing these costs. WHEREAS, Section 12 of the District Act requires the Board to conduct a public hearing to hear testimony on a project when: (1) the project is new construction and (2) the project is funded by single or joint zones of benefits. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Santa Clara Valley Water District as follows: SECTION 1 1. That the 24th day of May 2016 at 6:00 p.m., in the Boardroom of the Santa Clara Valley Water District, be fixed as the time and place for a public hearing on the Engineer’s Report and this Board of Directors will consider all written and oral comments to the proposed Project; and 2. That the Engineer’s Report for the proposed Project, titled “Boardroom Technology Upgrade Project Engineer’s Report” and dated April 12th, 2016, is available for public inspection by any interested person at Santa Clara Valley Water District’s office, 5700 Almaden Expressway, San Jose, CA 95118, and on the District’s websitehttp://www.valleywater.org/PublicReviewDocuments.aspx. Providing for the Notice of Time and Place of Public Hearing on the Engineer’s Report for the Boardroom Technology Upgrade Project Resolution No. 16- RL13319.docx 2 PASSED AND ADOPTED by the Board of Directors of Santa Clara Valley Water District by the following vote on May 10, 2016

Public hearing notice Topic: Boardroom Technology Upgrade Project Who: Santa Clara Valley Water District What: Public hearing on the Engineer’s Report When: May 24, 2016; Item is time certain at 6:00 P.M. Place: Santa Clara Valley Water District; Boardroom 5700 Almaden Expressway, San Jose, Ca 95118 Why: The proposed work of improvement is described in the Boardroom Technology Upgrade Project Engineer’s Report. The Report is on file at the Clerk of the Board of Directors, 5700 Almaden Expressway, San Jose, California and on Valley Water’s website:http://www.valleywater.org/PublicReviewDocuments.aspx The objective of the project is to upgrade the existing 17 years old audiovisual system and bring it to the latest standards of Video technology. At the time and place fixed for the public hearing, the Board of Directors will receive comments on the Engineer’s Report for the Project. After considering the comments, the Board will decide whether or not to proceed with the Project. For more information about this hearing or this Project, contact Sudhanshu Tikekar at (408) 630-2424. Reasonable efforts will be made to accommodate persons with disabilities wishing to attend this public hearing. For additional information on attending this hearing, including requesting accommodations for disabilities or interpreter assistance, please contact the Office of the Clerk of the Board at (408) 265-2607, ext. 2277, at least three business days prior to the hearing.

why dont they come out and say paul goeltz fucked it up, and got screwed by george kamenjati who tossed out 10% of my personal items. AND YOUR CLAIMS MANAGER SAID HE WOULD ASK TECH BUT NEVER DID?????

https://scvwd.legistar.com/View.ashx?M=A&ID=459787&GUID=990BC7C8-8851-489D-9FA1-C87E7AD681BF

ALL PDF BELOW AS THE PUBLIC AGENCY WILL NOT PRINT THEM OR MAKE AVAILABLE TO PUBLIC

Attachment 4 Project Delivery Process Chart

Attachment 3

ResolutionAttachment 2

Public Hearing Notice

Attachment 1 Engineer’s Report

Agenda

Attachment 4 Handout 8.1-A – Comment, P

DO_55681

DO_55650

Attachment 5 030816 Handout 8 1-B Goeltz062215

IT Ad Hoc Comm Agenda

1993-1994 Grand Jury Final Report

2005-2006 Grand Jury Final Report

2008-2009 Grand Jury Report – Part 4

2003-2004 Grand Jury Final Report

1999-2000 Grand Jury Final Report

2008-2009 Grand Jury Report – Part 3

2001-2002 Grand Jury Final Report

081115 IT Ad Hoc Comm

Agenda

Attachment 1 Handout 2

2008-2009 Grand Jury Report – Part 1

2008-2009 Grand Jury Report – Part 2

2008-2009 Grand Jury Report – Part 1

Handouts-Agenda Item 5.2scvwd ray 10 28 2014

SCVWD PGOELTZ 10 28 2014

Resolution Providing for the Notice of Time and Place of the Public Hearing on the Engineer’s Report for the Boardroom Audiovisual Modernization GOLDIE FUNG KAMENJATI

JOE HANDOUTDO_56501

DiversityAudit2012062215

IT Ad Hoc Comm Mins

sscistudy1

scvwd rayscvwd ray 10 28 2014

SCVWD PGOELTZ 10 28 2014

Resolution Providing for the Notice of Time and Place of the Public Hearing on the Engineer’s Report for the Boardroom Audiovisual Modernization GOLDIE FUNG KAMENJATI

JOE HANDOUT

DiversityAudit2012

Agenda (2)Agenda (3)Agenda (4)Agenda

062215 IT Ad Hoc Comm Agenda with rays input on matrix

DiversityAudit2012 explains a lot about scvwd

 

https://pgoeltz.wordpress.com/2016/03/11/santa-clara-valley-water-district-boardroom-3-8-2016/

https://pgoeltz.files.wordpress.com/2014/11/scvwd-pgoeltz-10-28-2014.pdf

https://pgoeltz.files.wordpress.com/2014/11/scvwd-ray-10-28-2014.pdf

https://pgoeltz.files.wordpress.com/2015/06/joe-handout.pdf

https://pgoeltz.files.wordpress.com/2015/07/handouts-agenda-item-5-2.pdf

SCVWD LIES ABOUT BOARDROOM 4 8 16 6PM

                                        SCVWD LIES ABOUT BOARDROOM

Featured Image -- 63

                     Boardroom Audio Visual Modernization Project Engineer’s Report.

LINKS WORK MAY NEED TO FOLLOW LINK OR COPY/PASTE

IMG_6121

VIEW THE PERJURY
Dear SCVWD  honorable board chair, members and staff.

Boardroom Audio Visual Modernization Project Engineer’s LIES.

 

This is your old av Sr tech, if you have ever been hooded winked it’s now, why do you think ray and i have been submitting papers on what kamenjati/fung/ravi.and ashu have done( stopped maintenance so the room will fail, paid contracts that have not been done just like rmc.)
has anyone from it staff told you about speaking into a microphone ( have they let me explain it or ray, have you seen members of Congress speak on c span? they speak directly into the mic, if others are not speaking directly into the mic, that also means YOU will not be able to hear them)   not saying your wrong but staff has not instructed you on use, nor have they let ray fix problems.  I was told when i was there not to talk to you about equipment.
 

The Stakeholders Matrix that is submitted for Item 8.1 for Board Meeting 3-8-2016 is from 12-6-2013. Where is the Stakeholders matrix mentioned in the Handout from the IT Ad Hoc Committee meeting June 22, 2015 item 5.2 (page 79) which is dated 4-1-15? Why is the updated version not submitted presently for the agenda item for the Board Members and Publics information?

Agenda

http://valleywater.org/About/ITAdHocAgendaMinutes.aspx


I WILL COME TO ANY MEETING AND SHOW YOU THE EQUIPMENT, THE PURCHASE PAPERS, AND SUPPLY  CONTRACTORS THAT WILL TELL YOU WE CAN SUPPORT THIS SYSTEM, OR WE INSTALLED THAT EQUIPMENT.
1. Has staff explained that the amx system can do voting, and request to speak as it does now. and that there is an open po with the programmer to have joystick control of ea camera,(( but not done as GK stopped work/SEE EMAIL)  Ask about the 10k of amx processing equipment gk had me buy before i retired/was forced out, but never installed)
2.  HD is not the answer as most people do not have fast internet connections and its bells  and whistles,  flat panels, you have flat panels.
3.  Has staff explained if you want to Skype you can do it now as the room is full of computers hooked to the system.  all you need is a staff person to handle it, that’s free, just download app, but you don’t need Skype, you have a video conferencing system(tandberg now Cisco)( can handle ip, isdn and phone calls  COST 77k$ per Larry wilson).


4.  Has staff told you that people can already call in as we installed a state of the art digital video conferencing system,  this equipment is still up to date.
5.  Has staff been truthful in say the system is 100 % analog no i replaced 75% of the audio and video processing so it is digital, as is the recording of the meetings  both video and audio.  This system can also record committee meetings, just turn cameras, and start recording. this is also digital video record, and audio is also captured on sd cards.  Also digital.
6.  HAS staff explained to you that we can do split screens, we can enlarge images, we can send, hook up and piece of equipment that comes into that board room, from digital to analog.
7. Has staff explained what the district cost will be, you cannot get that room to be rebuilt on 700k plus add the engineer’s cost, staff time already, and by the time the punch list is worked out it will be like the first board room where you sit costing over 2 million, you will want your own person running it not some temp/CONTRACTOR as is going to happen, but the sad thing is, yes its a nice room, but its not a room made for those types of meetings.
8.  This is my tax money just as much as yours, as Gary told ngoc why has nobody been fired, well why did George stop work in the board room, and not get fired? see the email in attachments.
why was George allowed to discuss with ray my marriage and medical problems, why  is George allowed to take av techs around the lake to tell them how things will be?
why has George been allowed to manipulate the techs, contractors and his staff, they are afraid of him.
9.  Has any of the staff told you that of 2 years ago the wireless microphone (frequencies) were sold by the FCC, which means that you could be fined, i told George of this before i left, as they did it with the original frequencies, so cell phones can have more bandwidth.
10.  I enjoyed working here but when the av MANAGEMENT cannot do there job, this is what happens.
11.  WHO IS PAYING FOR ELECTRICAL, WOODWORK, DRYWALL, PAINTING, BE SURE TO ADD THAT COST.
12.  IF PHIL IS A CTS WHY DID HE NOT SEE THE WIRELESS MICS WERE NOT SOLD OFF 2 YRS AGO MY THE FCC, ADD ANOTHER 20K, FOR  JUST 4 WIRELESS HANDHELDS AND LAVS?
13.  Staff Training: Clear Presentations & Mic Technique x OK Training/procedural Issue, MAYBE STAFF TRAINING AND A COUPLE OF UPGRADES IS ALL YOU NEED. Also what wrong with the beyer goosenecks, its what the board wanted, and if told how to use them they work fine.
14.  Simplify Rear Round Table  MOUNT CEILING THIS EQUIPMENT WAS BOUGHT IN 2011.
15..Provide Better Lighting From Front, Side and Back of Subjects x OK New cameras will operate better in low light conditions,  THE CAMERAS ARE FINE IS THE LIGHTING AS WAS TOLD TO TOM SPADA WHEN I WAS THERE.
16.  I WILL NOT EVEN BOTHER GOING OVER THE MATRIX AS MOST IF NOT ALL OF THAT CAN HAPPEN NOW.   IF YOU WOULD HAVE LISTEN TO THE AV TECH INPUTS (SEE HANDOUT), THEN MAYBE YOU MIGHT BE CLOSE.   I WISH YOU LUCK.   MOST IF NOT ALL OF THIS CAN HAPPEN NOW,  HOWEVER YOU HAVE NOT GOT THE RIGHT COSTS, NOR THE RIGHT ENGINEERS, NOR HAVE YOU THOUGHT OF THE USER’s, WHO STILL DON’T USE THE EQUIPMENT RIGHT. NOR HAVE YOU ASKED STAFF WHAT CAN THIS EQUIPMENT DO?
HURRY YOU STILL HAVE TIME TO ADD TO THE COST, FIGURE THE ACOUSTICS OUT, AND ASK HOW DID WE GET ENGINEERS WITH NO BOARDROOM EXPERIENCE.  Remember if you cannot grasp simple equipment, how will you manage higher tech?
Does staff and board  read employee reports, or any of the tapes, PR’s, expense reports etc.  we have provided links rebuttals but the board, managers just disregard the info, and keep wasting tax money.
 

AS DUG MUIRHEAD SAID YES I SAW THE SYSTEM break, SO IT SHOULD BE REPLACED, WELL WHAT WAS THE CAUSE OF THAT, GEORGE KAMENJATI STOPPED ALL WORK IN THE ROOM SO THINGS WILL FAIL, HE WOULD NOT EVEN LET RAY GO PICK UP THE TECH DRAWINGS FROM ME AT HOME, NOR GET ALL THE KEYS.

HAVE YOU LOOKED AT RGD NOT ONE BOARD ROOM

THIS ROOM IS UNIQUE, ANYONE CAN BUILD A ROOM
BUT THEY HAVE NOT ONE BOARDROOM UNDER THERE BELT.


http://rgdacoustics.com/index.php/projects/commercial/
THEY MIGHT BE ACOUSTICAL ENGINEERS, BUT SO WAS  MUZAK  AND SLATER AND ASSOCIATES, AND LOOK WHAT YOU GOT IN 1999.  THEY THEN SUB IT OUT TO A ONE MAN FIRM, THEN YOU HIRED GOELTZ TO FIX AND REPLACE MOST IF NOT ALL OF THE AUDIO AND VIDEO GEAR.
AS TO THE ENGINEER SAYING YOU WILL NEED 37 CONVERTERS IS JUST NOT TRUE, A TOP OF THE LINE CONVERTER CAN BE PLACED WITH THE TECH WHO WOULD HANDLE INPUTS OF VARIOUS DEVICES. AND A GOOD UNIT IN THE RACK TO HANDLE OTHER INPUTS IS ALL THAT IS REQUIRED.
THIS FIRM HAS BEEN PAID LIKE THE FIRST FIRM TO TELL THE IT DEPT AND YOU WANT YOU WANT, WHEN THIS IS INSTALLED IT WILL BE 5-10 YEARS OLD.  and there is no guarantee that hdmi,sd or whatever will be in favor.  Worry about the draught, add a couple of pieces and find out who stopped adding pieces so you can do a few of the things it cannot.
AND HAS THE ENGINEERS TOLD YOU HOW THEY PLAN TO USE THERE ACOUSTICAL EXPERIENCE, AND HOW THEY PLAN TO TRAIN THE END USER TO TALK INTO THE MICROPHONE, HAVE THEY ACCOUNTED FOR IMPROPER USE AND A BAD ROOM DESIGN?   
And them pushing you on this hdmi/sunshine act, is 100% wrong, you still have very old legacy computer systems, that are contracted out.  Again ask any local av company if this cannot be maintained and or repaired, it can, you do not need this level of upgrades, nor is 4k required, for the 100 people that watch.

AGAIN THIS COMPANY HAS BEEN PAID TO TELL YOU THIS BY NON OTHER THAN THE MANIPULATOR IN THE IT DEPT, AND UPPER STAFF.
 
again thank you
 paul goeltz

http://scvwd.granicus.com/MediaPlayer.php?view_id=3&clip_id=962&meta_id=105367

 paul addressing the board 12 2012 and hand out below title joe handout
attachments Attachment 2 Stakeholder Matrix  MOST IF NOT ALL CAN HAPPEN NOW. and not the current one.
https://vimeo.com/155258547 SCVWD MEETING NOTES MP3 06-22-15 IT Ad Hoc
Handouts-Agenda Item 5.2 READ WERE THE AV TECH WAS INVOLVED, BUT DISMISSED
https://pgoeltz.files.wordpress.com/2015/07/handouts-agenda-item-5-2.pdfscvwd ray 10 28 2014 EMAILS 062215 IT Ad Hoc Comm Mins  THE ONLY MEETING HELD and the asked for a 2nd meeting?? with rays input
scvwd ray RAYS REBUTTAL 10 28 14
SCVWD PGOELTZ 10 28 2014  SR AV TECH 10 28 14
 paul addressing the board 12 2012 ABOVE, and hand out below title joe handout 
DiversityAudit2012  GOOD READING EXPLAINS WHY SCVWD IS LIKE IT IS.

A Party!! Nothing surprises me here!!! From last nights video of the Board of Directors meeting, 3/8/2016 (Meeting starts 22:40)  ITEM 8.1 
http://scvwd.granicus.com/MediaPlayer.php?view_id=3&clip_id=1330&meta_id=151731

WHAT A DUMB B ITCH, JUST AS SICK AS GOVT PEOPLE THAT WASTE THE  TAXPAYERS MONEY AT FLIP OF SWITCH, WHY DOES NOT ONE COME, THEY DON’T GIVE A SHIT, AS THEY GOVT DOES NOT LISTEN!  OH MY MINDS FUCKED UP, WET MY PANTS LYING ABOUT TECHNOLOGY ISSUES, FALSE FLAG IF I EVER HEARD ONE EVEN IN LOCAL H2O POLITICS, SPEND TAXES

AND THE WINNER FOR THE LEAST CONVINCING PERFORMANCE GOES TOO….

“Oh I’m sorry- I don’t know why I am messing up tonight; maybe it was because we had some technologies issues tonight so I’m kind of blanking out on it.”
(“I think your right” someone shouts surrounded by laughter) Item 8.1 Audio Visual Upgrade!!” COME ON DOWN!!!

From the opening comments on Fluoridation in our drinking water (errr..Can we have a say on what poison we want to drink?? Thank You!) to this item… I wondered if I was watching a episode of Foul Ups, Bleeps and Blunders!!!??? LOL ..Wow!
And did the IT Manager really say “ the equipment …even thought not failing due to the good work of the av staff….”? Prior to this meeting, they stated the system has failed.

Hey if I can hear that online what is the problem in the room? ( “the sound box??” haha why not call it Boom Box!!??) Those meetings have agenda handouts for the public and I am certain they have hard copies at the Dias for all members. Perhaps their ipads have replaced the hard copies?? Reading the agenda, no one seemed to ask the important questions. Furthermore out of date documents were submitted and goes unnoticed by all. The conversation on this item left allot to be desired.

Black Electrical tape ( as mentioned by the director “does not indicate state of the art communications”) SHOULD NOT be a factor in a Full Audio Visual System Upgrade disguised as HD Broadcast with our tax payer monies of 600k either (Watch item 2.1 from 2014 . Link below ). At the end of the day WE ALL KNOW it will not just be 600k!!

http://scvwd.granicus.com/MediaPlayer.php?view_id=3&clip_id=1182&meta_id=127582

10 28 2014 MORE STAFF PERJURY THEMSELVES….

I watched the latest Board Meeting 3-8-16

Least convincing presentation award should go to Director Keagan . ” I don’t know why I’m messing up tonight… It’s Due to technologies issues tonight” Item 8.1 Boardroom HD broadcast system .. Come on down!!

Let’s staff blatantly present wrong info without any of the Directors taking them to task about . The agenda package has contradictions, do they not read this?

What is clear at the District is they don’t care about tax paying citizens voice, thank you ladies for speaking against fluoridation all these years ( can we have a say in what poison we drink ?? Thank you very much)

What is heard loud and clear with these meetings is , We don’t care about your voice and we will spend your monies how we see fit!
Thank you for your votes and your public funds!

 
THIS IS THE AUDIO NOTES OF LAST it AD HOC MEETING THEY WERE TO HAVE MANY
TO DECIDE THE LIES THIS  AUDIO TRANSCRIPT IS FULL OF SCVWD TELLING LIES, JUST LIKE BEAU WHO GOT FIRED FOR LYING SAD THING IS THIS GROUP IS ALL ELECTED BOARD MEMBERS, WE HAVE PROVEN THE IT DEPT LET THE ROOM FAIL SO THEY CAN SPEND ANOTHER 3 MILLION DURING DROUGHT, SOCIAL MEDIA FRIENDLY, LIKE THE BOARD IS GOING TO STOP IN THE MIDDLE OF MEETING TO TAKE A TWITTER QUESTION, PUBLIC COMMENT IS AT THE START, IF YOU CANNOT MAKE IT SEND EMAIL.
OR THAT ONLY 60K HAS BEEN SPENT WHEN THE ROOM COST OVER 3 MILLION AND I DID OVER 250K OF UPGRADES, GEORGE K TOOK THE TANDBERG vc SYSTEM OUT AND NEVER TOLD THE BOARD IT WAS PUT IN PER REQUEST FROM LARRY WILSON 70K.  SO SEE THE LIES DON’T STOP, FUNG, RAVI, JESASS(CAO) ASHU, GK THEY TELL THE CONTRACTOR WHAT TO SAY AND HOW TO LIE, WANT TO KNOW WHY ONLY ONE CONTRACTOR SHOWED UP FOR THE AV BID, THEY DON’T WANT TO DEAL WITH PSYCHOPATHS .  I CAN GO ON AND ON  I MADE THE ROOM DIGITAL, PUT ASSISTED LISTENING, AMX CAN HANDLE VOTING AS GK SAW THE DEMO, AND IF THEY LET THE TECHS DO THE AV NOT THE STAFF AND START MAINTENANCE, THINGS WOULD WORK, THERE IS OPEN PO’S FOR ANDERSON ENGINEERING FOR AMX WORK, GK BOUGHT OVER 50K OF GEAR FOR MODERNIZATION AND IT SITS.  IF YOU LOOK AT THE PDF OF REQUEST FOR MIC TRAINING NO ONE PERSON ASKED FOR IT WHICH IS THE CAUSE OF MOST PROBLEMS AUDIO WISE, YOU DON’T SPEAK SIDEWAYS INTO MIC.
BACKGROUND: The Boardroom’s audiovisual system was designed in 1997 and built in 2000. (UPGRADED UP TILL 2012 UNTIL GK STOPPED WORK ASK THE AV TECH, OVER 250K SPENT) In addition to the board’s own public meetings, the existing system is used for the District’s many internal divisional, unit, and group meetings, and frequently for other general district and community events of a business, educational, outreach, or celebratory nature. The existing legacy analog-based audiovisual system, uses technology designed over 17 years ago and does not provide for enhanced features of an e-voting ( AMX WILL HANDLE E VOTING AS EA MEMBER ALREADY HAS A AMX SCREEN FOR VOTING)and high resolution multi-screen (ALREADY HAVE MULTI SCREEN AND HD IS A WASTE WHEN 1024X 768 IS BEST) viewing, archiving, editing, casting and streaming of digital audio and video signals. ( SYSTEM IS ALREADY DIGITAL AND DIGITALLY RECORDED BOTH AUDIO AND VIDEO IN 2 DIGITAL FORMATS,)This system is not capable of integrating a sophisticated digital e-voting system and related (ALL LIES ITS ALL SET UP AND JUST NEEDS PROGRAMMING AS ANY NEW SYSTEM WOULD)features, nor does it have enough capacity or compatibility to provide for additional multi-signal switching of wired and wireless digital devices that can accommodate multi-scenario featured meetings. The existing system requires dedicated staff resources to insure basic operation during board meetings. ( ANY AV SYSTEM IS JUST LIKE A CONCERT A CREW IS REQUIRED WHO IS GOING TO WORK THE TWITTER FEED?)The reliability of this aged system is unpredictable and on many occasions has experienced audiovisual devices and power-related deficiencies and failures. Because of the new features requirements, technology limitations and exiting issues, the Project scope will completely overhaul the AV system and provide for a modern electronic voting system. THE SYSTEM WOULD WORK FINE WITH TRAINING AND ASK THE TECH TO TELL YOU WHAT THE SYSTEM CAN DO, GK STOPPED WORK SO THEY CAN REBUILD THEY SAY 900K ITS MORE LIKE ANOTHER 3 MILLION, AS THEY ARE NOT INCLUDING SCVWD STAFF TIME
http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2014_Published_Meetings/MG55522/AS55533/AI55560/DO55650/DO_55650.pdf     this report is all based on lies and untruths dont believe the sr tech ask fired temps or the av tech.

AS DUG MUIRHEAD SAID YES I SAW THE SYSTEM FAIL, SO IT SHOULD BE REPLACED, WELL WHAT WAS THE CAUSE OF THAT, GEORGE KAMENJATI STOPPED ALL WORK IN THE ROOM SO THINGS WILL FAIL, HE WOULD NOT EVEN LET RAY GO PICK UP THE TECH DRAWINGS FROM ME AT HOME, NOR GET ALL THE KEYS.

Attachment 1 Engineer’s Letter  NEW REPORT 2 2016

Attachment 2 Stakeholder Matrix  MOST IF NOT ALL CAN HAPPEN NOW.

BTW WHAT HAPPENED TO THE MATRIX WORKED ON BY THE AV TECH?

Handouts-Agenda Item 5.2 READ WERE THE AV TECH WAS INVOLVED, BUT DISMISSED

 

http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2014_Published_Meetings/MG55522/AS55533/AI55560/DO55650/DO_55650.pdf

062215 IT Ad Hoc Comm Mins  THE ONLY MEETING HELD NO PUBLIC AND WHOLE REPORT IS BASED ON LIES.

Handouts-Agenda Item 5.2 AV TECH REBUTTAL MORE FUNNY STUFF. read this from av tech.

P Goeltz Release (1) THEY WANT ME TO SIGN THIS FOR MY MISSING STUFF AND BE QUITE ABOUT THE BOARDROOM LIES.

scvwd ray RAYS REBUTTAL 10 28 14

SCVWD PGOELTZ 10 28 2014  SR AV TECH 10 28 14

Resolution Providing for the Notice of Time and Place of the Public Hearing on the Engineer’s Report for the Boardroom Audiovisual Modernization GOLDIE FUNG KAMENJATI  THIS IS PURE LIES, WHY THEY PERSIST ON NOT LISTENING TO  SR TECH AND LISTENING TO LIES LEARNED BY MANAGERS FROM BEAU.

JOE HANDOUT INFO ON BOARDROOM SENT TO JOE JUDGE ALERTING HIM AND OTHERS OF FRAUD ETC.

DiversityAudit2012  GOOD READING EXPLAINS WHY SCVWD IS LIKE IT IS.

 

AUDIO FROM THE ONLY MEETING HELD, ENGINEER LIES AND ASHU LIES CAN BE DOWN LOADED HERE. or watch video i made with rebuttal    …

https://vimeo.com/155258547 SCVWD MEETING NOTES MP3 06-22-15 IT Ad Hoc

https://scvwd.egnyte.com/fl/bpxZ1qv1v9#folder-link/rstewart/06-22-15%20IT%20Ad%20Hoc

 

PLEASE LISTEN TO THE TECH OR ME AND I CAN EXPLAIN WHAT IS INSTALLED HOW AMX CAN HANDLE VOTING AND HOW SYSTEM IS ALREADY SOCIAL MEDIA FRIENDLY.

I CAN EXPLAIN HOW MUCH HAS BEEN SPENT AND WERE THE EQUIPMENT IS. AS CAN THE  AV TECH

SCVWD SELLING ART WITH YOUR TAX DOLLARS????

ARTWORK SCVWD SUPPORTS DURING DROUGHT????

Boardroom Audio Visual Modernization Project Engineer’s Report.

THIS IS THE AUDIO NOTES OF LAST it AD HOC MEETING THEY WERE TO HAVE MANY

https://scvwd.egnyte.com/fl/bpxZ1qv1v9#folder-link/rstewart/06-22-15%20IT%20Ad%20Hoc ad hoc folder

TO DECIDE THE LIES THIS  AUDIO TRANSCRIPT IS FULL OF SCVWD TELLING LIES, JUST LIKE BEAU WHO GOT FIRED FOR LYING SAD THING IS THIS GROUP IS ALL ELECTED BOARD MEMBERS, WE HAVE PROVEN THE IT DEPT LET THE ROOM FAIL SO THEY CAN SPEND ANOTHER 3 MILLION DURING DROUGHT, SOCIAL MEDIA FRIENDLY, LIKE THE BOARD IS GOING TO STOP IN THE MIDDLE OF MEETING TO TAKE A TWITTER QUESTION, PUBLIC COMMENT IS AT THE START, IF YOU CANNOT MAKE IT SEND EMAIL.

OR THAT ONLY 60K HAS BEEN SPENT WHEN THE ROOM COST OVER 3 MILLION AND I DID OVER 250K OF UPGRADES, GEORGE K TOOK THE TANDBERG vc SYSTEM OUT AND NEVER TOLD THE BOARD IT WAS PUT IN PER REQUEST FROM LARRY WILSON 70K.  SO SEE THE LIES DON’T STOP, FUNG, RAVI, JESASS(CAO) ASHU, GK THEY TELL THE CONTRACTOR WHAT TO SAY AND HOW TO LIE, WANT TO KNOW WHY ONLY ONE CONTRACTOR SHOWED UP FOR THE AV BID, THEY DON’T WANT TO DEAL WITH PSYCHOPATHS .  I CAN GO ON AND ON  I MADE THE ROOM DIGITAL, PUT ASSISTED LISTENING, AMX CAN HANDLE VOTING AS GK SAW THE DEMO, AND IF THEY LET THE TECHS DO THE AV NOT THE STAFF AND START MAINTENANCE, THINGS WOULD WORK, THERE IS OPEN PO’S FOR ANDERSON ENGINEERING FOR AMX WORK, GK BOUGHT OVER 50K OF GEAR FOR MODERNIZATION AND IT SITS.  IF YOU LOOK AT THE PDF OF REQUEST FOR MIC TRAINING NO ONE PERSON ASKED FOR IT WHICH IS THE CAUSE OF MOST PROBLEMS AUDIO WISE, YOU DON’T SPEAK SIDEWAYS INTO MIC.

http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2014_Published_Meetings/MG55522/AS55533/AI55560/DO55650/DO_55650.pdf  LISTEN TO THESE LIES

BACKGROUND: The Boardroom’s audiovisual system was designed in 1997 and built in 2000. (UPGRADED UP TILL 2012 UNTIL GK STOPPED WORK ASK THE AV TECH, OVER 250K SPENT) In addition to the board’s own public meetings, the existing system is used for the District’s many internal divisional, unit, and group meetings, and frequently for other general district and community events of a business, educational, outreach, or celebratory nature. The existing legacy analog-based audiovisual system, uses technology designed over 17 years ago and does not provide for enhanced features of an e-voting ( AMX WILL HANDLE E VOTING AS EA MEMBER ALREADY HAS A AMX SCREEN FOR VOTING)and high resolution multi-screen (ALREADY HAVE MULTI SCREEN AND HD IS A WASTE WHEN 1024X 768 IS BEST) viewing, archiving, editing, casting and streaming of digital audio and video signals. ( SYSTEM IS ALREADY DIGITAL AND DIGITALLY RECORDED BOTH AUDIO AND VIDEO IN 2 DIGITAL FORMATS,)This system is not capable of integrating a sophisticated digital e-voting system and related (ALL LIES ITS ALL SET UP AND JUST NEEDS PROGRAMMING AS ANY NEW SYSTEM WOULD)features, nor does it have enough capacity or compatibility to provide for additional multi-signal switching of wired and wireless digital devices that can accommodate multi-scenario featured meetings. The existing system requires dedicated staff resources to insure basic operation during board meetings. ( ANY AV SYSTEM IS JUST LIKE A CONCERT A CREW IS REQUIRED WHO IS GOING TO WORK THE TWITTER FEED?)The reliability of this aged system is unpredictable and on many occasions has experienced audiovisual devices and power-related deficiencies and failures. Because of the new features requirements, technology limitations and exiting issues, the Project scope will completely overhaul the AV system and provide for a modern electronic voting system. THE SYSTEM WOULD WORK FINE WITH TRAINING AND ASK THE TECH TO TELL YOU WHAT THE SYSTEM CAN DO, GK STOPPED WORK SO THEY CAN REBUILD THEY SAY 900K ITS MORE LIKE ANOTHER 3 MILLION, AS THEY ARE NOT INCLUDING SCVWD STAFF TIME

https://scvwd.egnyte.com/fl/bpxZ1qv1v9#folder-link/rstewart/06-22-15%20IT%20Ad%20Hoc

http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2014_Published_Meetings/MG55522/AS55533/AI55560/DO55650/DO_55650.pdf     this report is all based on lies and untruths dont believe the sr tech ask fired temps or the av tech.

http://cf.valleywater.org/About_Us/Board_of_directors/Board_meetings/_2014_Published_Meetings/MG55522/AS55533/AI55560/DO55650/DO_55650.pdf

A Party!! Nothing surprises me here!!! From last nights video of the Board of Directors meeting, 3/8/2016 (Meeting starts 22:40)  ITEM 8.1 
http://scvwd.granicus.com/MediaPlayer.php?view_id=3&clip_id=1330&meta_id=151731

WHAT A DUMB BITCH, JUST AS SICK AS GOVT PEOPLE THAT WASTE THE  TAXPAYERS MONEY AT FLIP OF SWITCH, WHY DOES NOT ONE COME, THEY DON’T GIVE A SHIT, AS THEY GOVT DOES NOT LISTEN!  OH MY MINDS FUCKED UP, WET MY PANTS LYING ABOUT TECHNOLOGY ISSUES, FALSE FLAG IF I EVER HEARD ONE EVEN IN LOCAL H2O POLITICS, SPEND TAXES

AND THE WINNER FOR THE LEAST CONVINCING PERFORMANCE GOES TOO….

“Oh I’m sorry- I don’t know why I am messing up tonight; maybe it was because we had some technologies issues tonight so I’m kind of blanking out on it.”
(“I think your right” someone shouts surrounded by laughter) Item 8.1 Audio Visual Upgrade!!” COME ON DOWN!!!

From the opening comments on Fluoridation in our drinking water (errr..Can we have a say on what poison we want to drink?? Thank You!) to this item… I wondered if I was watching a episode of Foul Ups, Bleeps and Blunders!!!??? LOL ..Wow!
And did the IT Manager really say “ the equipment …even thought not failing due to the good work of the av staff….”? Prior to this meeting, they stated the system has failed.

Hey if I can hear that online what is the problem in the room? ( “the sound box??” haha why not call it Boom Box!!??) Those meetings have agenda handouts for the public and I am certain they have hard copies at the Dias for all members. Perhaps their ipads have replaced the hard copies?? Reading the agenda, no one seemed to ask the important questions. Furthermore out of date documents were submitted and goes unnoticed by all. The conversation on this item left allot to be desired.

Black Electrical tape ( as mentioned by the director “does not indicate state of the art communications”) SHOULD NOT be a factor in a Full Audio Visual System Upgrade disguised as HD Broadcast with our tax payer monies of 600k either (Watch item 2.1 from 2014 . Link below ). At the end of the day WE ALL KNOW it will not just be 600k!!

http://scvwd.granicus.com/MediaPlayer.php?view_id=3&clip_id=1182&meta_id=127582

10 28 2014 MORE STAFF PERJURY THEMSELVES….

I watched the latest Board Meeting 3-8-16

Least convincing presentation award should go to Director Keagan . ” I don’t know why I’m messing up tonight… It’s Due to technologies issues tonight” Item 8.1 Boardroom HD broadcast system .. Come on down!!

Let’s staff blatantly present wrong info without any of the Directors taking them to task about . The agenda package has contradictions, do they not read this?

What is clear at the District is they don’t care about tax paying citizens voice, thank you ladies for speaking against fluoridation all these years ( can we have a say in what poison we drink ?? Thank you very much)

What is heard loud and clear with these meetings is , We don’t care about your voice and we will spend your monies how we see fit!
Thank you for your votes and your public funds!

 
THIS IS THE AUDIO NOTES OF LAST it AD HOC MEETING THEY WERE TO HAVE MANY
TO DECIDE THE LIES THIS  AUDIO TRANSCRIPT IS FULL OF SCVWD TELLING LIES, JUST LIKE BEAU WHO GOT FIRED FOR LYING SAD THING IS THIS GROUP IS ALL ELECTED BOARD MEMBERS, WE HAVE PROVEN THE IT DEPT LET THE ROOM FAIL SO THEY CAN SPEND ANOTHER 3 MILLION DURING DROUGHT, SOCIAL MEDIA FRIENDLY, LIKE THE BOARD IS GOING TO STOP IN THE MIDDLE OF MEETING TO TAKE A TWITTER QUESTION, PUBLIC COMMENT IS AT THE START, IF YOU CANNOT MAKE IT SEND EMAIL.
OR THAT ONLY 60K HAS BEEN SPENT WHEN THE ROOM COST OVER 3 MILLION AND I DID OVER 250K OF UPGRADES, GEORGE K TOOK THE TANDBERG vc SYSTEM OUT AND NEVER TOLD THE BOARD IT WAS PUT IN PER REQUEST FROM LARRY WILSON 70K.  SO SEE THE LIES DON’T STOP, FUNG, RAVI, JESASS(CAO) ASHU, GK THEY TELL THE CONTRACTOR WHAT TO SAY AND HOW TO LIE, WANT TO KNOW WHY ONLY ONE CONTRACTOR SHOWED UP FOR THE AV BID, THEY DON’T WANT TO DEAL WITH PSYCHOPATHS .  I CAN GO ON AND ON  I MADE THE ROOM DIGITAL, PUT ASSISTED LISTENING, AMX CAN HANDLE VOTING AS GK SAW THE DEMO, AND IF THEY LET THE TECHS DO THE AV NOT THE STAFF AND START MAINTENANCE, THINGS WOULD WORK, THERE IS OPEN PO’S FOR ANDERSON ENGINEERING FOR AMX WORK, GK BOUGHT OVER 50K OF GEAR FOR MODERNIZATION AND IT SITS.  IF YOU LOOK AT THE PDF OF REQUEST FOR MIC TRAINING NO ONE PERSON ASKED FOR IT WHICH IS THE CAUSE OF MOST PROBLEMS AUDIO WISE, YOU DON’T SPEAK SIDEWAYS INTO MIC.